Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Wastewater treatment plants - Part 7: Biological fixed-film reactors
10.99 New project approved
Gully tops and manhole tops for vehicular and pedestrian areas - Part 7: Gully tops and manhole tops made of polyamide
40.60 Close of voting
Gully tops and manhole tops for vehicular and pedestrian areas - Part 700: Factory production control, thirdparty monitoring and certification for gully tops and manhole tops made of polyamide
40.60 Close of voting
Sanitary tapware - Pressure flushing valves and automatic closing urinal valves PN 10
50.60 Close of voting. Proof returned by secretariat
Water supply - Indirectly heated unvented (closed) hot water storage tanks - Part 1: General specifications and common test methods
40.20 DIS ballot initiated: 12 weeks
Devices to prevent pollution by backflow of potable water - Unrestricted air gap-Family A - Type A
40.10 harmonizedStageCodeLabel.40.10
Non controllable backflow preventer with different pressure zones - Family C, type A
40.10 harmonizedStageCodeLabel.40.10
Building valves - Combined temperature and pressure relief valves - Tests and requirements
40.60 Close of voting
Influence of metallic materials on water intended for human consumption - Dynamic rig test for assessment of metal release - Part 1: Design and operation
50.60 Close of voting. Proof returned by secretariat
Water conditioning equipment inside buildings - Adjustable chemical dosing systems - Requirements for performance, safety and testing
50.60 Close of voting. Proof returned by secretariat
Performance testing of on-site non-potable water systems - Part 1: Greywater systems
40.60 Close of voting
Vitrified clay pipe systems for drains and sewers - Part 3: Test methods
40.20 DIS ballot initiated: 12 weeks
Vitrified clay pipe systems for drains and sewers - Part 8: Requirements for the use of vitrified clay components in the rehabilitation of drainage systems and conditions for the application of methods for rehabilitation in existing drainage systems
40.60 Close of voting
Drain and sewer systems outside buildings — Sewer system management
40.60 Close of voting
Specifications for installations inside buildings conveying water intended for human consumption - Part 1: General
40.60 Close of voting
Specification for installations inside buildings conveying water intended for human consumption - Part 2: Design
40.60 Close of voting
Separator systems for light liquids (e.g. oil and petrol) - Part 2: Selection of nominal size, installation, operation and maintenance
10.99 New project approved