Телефон: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Продаја стандарда: prodaja@iss.rs Семинари, обуке: iss-edukacija@iss.rs Информације о стандардима: infocentar@iss.rs
Стевана Бракуса 2, 11030 Београд
Главни мени

IEC TS 63398 ED1

Black start of hydropower plant

Опште информације

50.20     19. 12. 2025.

PRVDTS    13. 2. 2026.

IEC

TC 4

Техничка спецификација

27.140  

Апстракт

a. This technical specification specifies the requirements of basic technical conditions, test, startup procedure, and emergency handling for black start of hydropower plant.
b. This document defines the technical requirements of hydraulic generator, hydraulic turbine regulating system, excitation system, relay protection, control system, computer monitoring system, DC system, auxiliary equipment, communication equipment, working gate and main valve of water inlet of turbine for two black starts modes.
c. This document gives guidelines for black start test in terms of equipment system test, black start power test, phase test, overall test, and black start mode identification.
d. This technical specification is applicable to hydropower plant with black start capabilities. However, it does not apply to plants without black start capability. Hydraulic structures, such as dams and reservoirs, and transformers, switchgears are not included.

Животни циклус

ТРЕНУТНО

ПРОЈЕКАТ
IEC TS 63398 ED1
50.20 Почетак поступка одобравања дефинитивног текста нацрта стандарда
19. 12. 2025.

Преглед

Да бисте видели цео садржај, морате се регистровати или пријавити помоћу корисничког имена које већ имате.

Пријавите се