SRPS EN IEC 61400-27-2:2022

Wind energy generation systems - Part 27-2: Electrical simulation models - Model validation

Apr 29, 2022

General information

60.60     Apr 29, 2022

ISS

N088

European Norm

27.180  

English  

Buying

Published

Language in which you want to receive the document.

Scope

IEC 61400-27-2:2020 specifies procedures for validation of electrical simulation models for wind turbines and wind power plants, intended to be used in power system and grid stability analyses. The validation procedures are based on the tests specified in IEC 61400-21 (all parts). The validation procedures are applicable to the generic models specified in

IEC 61400-27-1 and to other fundamental frequency wind power plant models and wind turbine models.

The validation procedures for wind turbine models focus on fault ride through capability and control performance. The fault ride through capability includes response to balanced and unbalanced voltage dips as well as voltage swells. The control performance includes active power control, frequency control, synthetic inertia control and reactive power control. The validation procedures for wind turbine models refer to the tests specified in IEC 61400-21-1. The validation procedures for wind turbine models refer to the wind turbine terminals.

Life cycle

NOW

PUBLISHED
SRPS EN IEC 61400-27-2:2022
60.60 Standard published
Apr 29, 2022

REVISED BY

PROJECT
prSRPS EN IEC 61400-27-2:2025

Related project

Adopted from EN IEC 61400-27-2:2020

Adopted from IEC 61400-27-2:2020 ED1 IDENTICAL