Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Drain and sewer systems outside buildings - Management and control of activities - Part 1: General requirements
Wastewater treatment plants - Part 11: General data required
Wastewater treatment plants - Part 10: Safety principles
Wastewater treatment plants - Part 6: Activated sludge process
Wastewater treatment plants - Part 4: Primary treatment
Geotechnical investigation and testing - Laboratory testing of soil - Part 12: Determination of liquid and plastic limits - Amendment 2 (ISO 17892-12:2018/Amd 2:2022)
Geotechnical investigation and testing - Laboratory testing of soil - Part 12: Determination of liquid and plastic limits - Amendment 1 (ISO 17892-12:2018/Amd 1:2021)
Geotechnical investigation and testing - Laboratory testing of soil - Part 12: Determination of liquid and plastic limits (ISO 17892-12:2018)
Bituminous mixtures - Test methods - Part 48: Interlayer Bonding
Bituminous mixtures - Test method - Part 33: Specimen prepared by roller compactor
Bituminous mixtures - Test methods - Part 36: Determination of the thickness of bituminous pavement
Earthworks - Part 2: Classification of materials
Earthworks - Part 1: Principles and general rules
Acoustics - Determination of airflow resistance - Part 1: Static airflow method (ISO 9053-1:2018)
Hydrometric determinations — Flow measurements in open channels using structures — Guidelines for selection of structure
Hydrometry — Functional requirements and characteristics of suspended-sediment samplers
Construction and testing of drains and sewers
Hydrometry - Vocabulary and symbols (ISO 772:2022)