Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Instrument transformers - Part 7: Specific requirements for electronic voltage transformers
10.99 New project approved
Instrument transformers - Part 8: Specific requirements for electronic current transformers
10.99 New project approved
Instrument transformers - Part xx: Current sensors
10.99 New project approved
Industrial networks - Installation of communication networks in industrial premises
10.99 New project approved
Low-voltage power capacitors - Power factor correction banks
10.99 New project approved
Insulators for overhead lines - Composite line post insulators for AC systems with a nominal voltage greater than 1 000 v - Definitions, test methods and acceptance criteria
10.99 New project approved
Integrated circuits - Measurement of electromagnetic emissions - Part 1: General conditions and definitions
10.99 New project approved
Application integration at electric utilities - System interfaces for distribution management - Part 11: Common information model (CIM) extensions for distribution
10.99 New project approved
Application integration at electric utilities - System interfaces for distribution management - Part 8: Interfaces for customer operations
10.99 New project approved
Energy Management System Application Program Interface (EMS-API) - Part 303: Common information model (CIM), Network Model Management
10.99 New project approved
Energy Management System Application Program Interface (EMS-API) - Part 459: Framework for managing shared network model information
10.99 New project approved
Energy management system application program interface (EMS-API) - Part 501: Common Information Model Resource Description Framework (CIM RDF) schema
10.99 New project approved
Requirements of bidirectional wireless power transfer for electric vehicles
10.99 New project approved
Fibre optic interconnecting devices and passive components - Reliability - Part 9-1: Qualification of passive optical components
10.99 New project approved
Hydraulic machines - Acceptance tests of small hydroelectric installations
10.99 New project approved
Semiconductor optoelectronic devices for fibre optic system applications - Part 1: Specification template for essential ratings and characteristics
10.99 New project approved
Uninterruptible power systems (UPS) - Part 5-1: DC output UPS - Safety requirements
10.99 New project approved
Accuracy test method for static electricity meters under dynamic load conditions
10.99 New project approved