Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Water quality - Gross alpha and gross beta activity - Test method using liquid scintillation counting (ISO/DIS 11704:2025)
45.99 Dispatch of FV draft to CCMC
Sterilization of health care products - Microbiological methods - Part 1: Determination of a population of microorganisms on products (ISO/DIS 11737-1:2026)
40.60 Close of voting
Sterilization of health care products - Microbiological methods - Part 3: Bacterial endotoxin testing (ISO 11737-3:2023)
40.60 Close of voting
Information security — Key management — Part 3: Mechanisms using asymmetric techniques — Amendment 1: TFNS identity-based key agreement
10.99 New project approved
Windows and doors - Resistance to repeated opening and closing - Test method
45.99 Dispatch of FV draft to CCMC
Reaction to fire tests - Ignitability of products subjected to direct impingement of flame - Part 2: Single-flame source test (ISO 11925-2:2026)
50.60 Close of voting. Proof returned by secretariat
Paints and varnishes - Determination of resistance to cyclic corrosion conditions - Part 1: Wet (salt fog)/dry/humid (ISO 11997-1:2026)
50.60 Close of voting. Proof returned by secretariat
Paints and varnishes - Determination of wet-scrub resistance of coatings (ISO/FDIS 11998:2026)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Building construction - Organization of information about construction works - Part 2: Framework for classification and breakdown structures (ISO/DIS 12006-2:2025)
40.60 Close of voting
Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 2: Specific functional requirements for polyethylene (MOP up to and including 10 bar)
10.99 New project approved
Operating forces - Test method - Part 2: Doors
50.60 Close of voting. Proof returned by secretariat
Wastewater lifting plants for buildings and sites - Part 1: Lifting plants for wastewater containing faecal matter
10.99 New project approved
Wastewater lifting plants for buildings and sites - Part 2: Lifting plants for faecal-free wastewater
10.99 New project approved
Wastewater lifting plants for buildings and sites - Part 4: Non-return valves for faecal-free wastewater and wastewater containing faecal matter
10.99 New project approved
Fixed firefighting systems - Components for gas extinguishing systems - Part 8: Characteristics for connectors
50.60 Close of voting. Proof returned by secretariat
Mechanical vibration - Declaration and verification of vibration emission values
50.60 Close of voting. Proof returned by secretariat
Safety of machinery - General principles for design - Risk assessment and risk reduction (ISO/DIS 12100:2026)
40.20 DIS ballot initiated: 12 weeks