Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

Projects

Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard

Ventilation for buildings - Test procedures and measurement methods to hand over air conditioning and ventilation systems and air conditioning systems for non-residential buildings

50.60   Close of voting. Proof returned by secretariat

M115 more

Precast autoclaved aerated concrete products

50.60   Close of voting. Proof returned by secretariat

U071 more

Industrial, commercial and garage doors and gates - Mechanical aspects - Requirements and test methods

40.60   Close of voting

U162 more

Unplasticized poly(vinyl chloride) (PVC-U) profiles for the fabrication of windows and doors - Classification, requirements and test methods - Part 1: Non-covered PVC-U profiles

50.60   Close of voting. Proof returned by secretariat

U162 more

Unplasticized poly(vinyl chloride) (PVC-U) profiles for the fabrication of windows and doors - Classification, requirements and test methods - Part 3: PVC-U profiles covered with paint.

50.60   Close of voting. Proof returned by secretariat

U162 more

Tissue paper and tissue products - Part 8: Water-absorption time and water-absorption capacity, basket-immersion test method (ISO/DIS 12625-8:2026)

40.60   Close of voting

H006 more

Thermal insulating products for building equipment and industrial installations - Determination of dimensions, squareness and linearity of preformed pipe insulation - Amendment 1 (ISO 12628:2022/Amd 1:2025)

50.60   Close of voting. Proof returned by secretariat

U163 more

Graphic technology — Prepress digital data exchange — Part 1: Colour targets for input scanner calibration

10.99   New project approved

H130 more

Graphic technology — Process control for the production of half-tone colour separations, proofs and production prints — Part 3: Coldset offset lithography on newsprint

10.99   New project approved

H130 more

Graphic technology — Process control for the production of half-tone colour separations, proof and production prints — Part 4: Publication gravure printing

10.99   New project approved

H130 more

Graphic technology — Process control for the manufacture of half-tone colour separations, proof and production prints — Part 5: Screen printing

10.99   New project approved

H130 more

Graphic technology — Process control for the production of half-tone colour separations, proofs and production prints — Part 6: Flexographic printing

10.99   New project approved

H130 more

Thermal performance of building materials and products - Determination of thermal resistance by means of guarded hot plate and heat flow meter methods - Dry and moist products of medium and low thermal resistance

40.60   Close of voting

U163 more

Plastics piping systems for non-pressure underground drains and sewers - Polyethylene (PE) - Part 1: Specifications for pipes, fittings and the system

50.60   Close of voting. Proof returned by secretariat

G061 more

Plastics piping systems for non‐pressure underground drains and sewers - Polyethylene (PE)- Part 2: Assessment of conformity

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

G061 more

Thermal performance of building materials and products - Determination of thermal resistance by means of guarded hot plate and heat flow meter methods - Products of high and medium thermal resistance

40.60   Close of voting

U163 more

Founding - Ultrasonic testing - Part 4: Phased array ultrasonic testing of steel castings

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

C017-2 more

Founding - Radiographic testing - Part 1: Film techniques

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

C017-2 more