Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Ventilation for buildings - Components/products for residential ventilation - Required and optional performance characteristics
40.60 Close of voting
Water quality - Strontium 90 and strontium 89 - Test methods using liquid scintillation counting or proportional counting (ISO/DIS 13160:2026)
40.20 DIS ballot initiated: 12 weeks
Leak detection systems - Part 2: Requirements and test/assessment methods for pressure and vacuum systems
40.60 Close of voting
Leak detection systems - Part 3: Requirements and test/assessment methods for liquid systems for tanks
40.60 Close of voting
Leak detection systems - Part 4: Requirements and test/assessment methods for sensor-based leak detection systems
40.60 Close of voting
Leak detection systems - Part 7: Requirements and test/assessment methods for interstitial spaces, leak detection linings and leak detection jackets
40.60 Close of voting
Water quality - Radon-222 - Part 1: General principles (ISO/DIS 13164-1:2026)
40.60 Close of voting
Water quality - Radon-222 - Part 2: Test method using gamma-ray spectrometry (ISO/DIS 13164-2:2026)
40.60 Close of voting
Water quality - Radon-222 - Part 3: Test method using emanometry (ISO/DIS 13164-3:2026)
40.60 Close of voting
Water quality - Uranium - Test method using alpha liquid scintillation counting (ISO/DIS 13169:2025)
40.60 Close of voting
Thermal insulation products - Common evaluation rules
50.60 Close of voting. Proof returned by secretariat
Spectator facilities - Part 10: Calculating of safe capacity in case of emergency
40.60 Close of voting
Road lighting - Part 4: Methods of measuring lighting performance
40.10 harmonizedStageCodeLabel.40.10
Road lighting - Part 5: Energy performance indicators
40.10 harmonizedStageCodeLabel.40.10
Gas-fired domestic appliances producing hot water - Part 2: Assessment of energy consumption
20.60 Close of comment period