Low-voltage switchgear and controlgear - Part 9-2: Active arc-fault mitigation systems - Optical-based internal arc-detection and mitigation devices
50.60 Close of voting. Proof returned by secretariat
Rules for steam turbine thermal acceptance tests - Part 1: High accuracy for large condensing steam turbines
40.60 Close of voting
Rules for steam turbine thermal acceptance tests - Part 4: Routine testing
50.60 Close of voting. Proof returned by secretariat
Self-ballasted fluorescent lamps for general lighting services - Safety requirements
50.60 Close of voting. Proof returned by secretariat
Arc welding equipment - Part 1: Welding power sources
40.60 Close of voting
Arc welding equipment - Part 10: Electromagnetic compatibility (EMC) requirements
50.60 Close of voting. Proof returned by secretariat
Arc welding equipment - Part 12: Coupling devices for welding cables
50.60 Close of voting. Proof returned by secretariat
Arc welding equipment - Arc welding equipment - Part 12: Coupling devices for welding cables
10.99 New project approved
Arc welding equipment - Part 4: Periodic inspection and testing
50.60 Close of voting. Proof returned by secretariat
Live working - Electrical insulating sleeves
10.99 New project approved
Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤16 a per phase and not subject to conditional connection
20.60 Close of comment period
Electromagnetic compatibility (EMC) - Part 3: Limits - Section 3: Limitation of voltage fluctuations and flicker in low-voltage supply systems for equipment with rated current ≤ 16 A
40.60 Close of voting
Electromagnetic compatibility (EMC) - Part 4-29: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations on d.c. input power port immunity tests
40.60 Close of voting
Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
40.20 DIS ballot initiated: 12 weeks
Electromagnetic compatibility (EMC) - Part 4-30: Testing and measurement techniques - Power quality measurement methods
10.99 New project approved
Electromagnetic compatibility (EMC) - Part 6-3: Generic standards - Emission standard for equipment in residential locations
50.60 Close of voting. Proof returned by secretariat
Residual current operated circuit-breakers without integral overcurrent protection for household and similar uses (RCCBs) - Part 1: General rules
45.99 Dispatch of FV draft to CCMC
Residual current operated circuit-breakers without integral overcurrent protection for household and similar uses (RCCBs) - Part 1: General rules
45.99 Dispatch of FV draft to CCMC