Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Low-voltage switchgear and controlgear - Part 1: General rules
40.60 Close of voting
Low-voltage switchgear and controlgear - Part 1: General rules
40.60 Close of voting
Low-voltage switchgear and controlgear - Part 10: Semiconductor circuit-breakers
50.60 Close of voting. Proof returned by secretariat
Low-voltage switchgear and controlgear - Part 2: Circuit-breakers
50.60 Close of voting. Proof returned by secretariat
Low-voltage switchgear and controlgear - Part 3: Switches, disconnectors, switch-disconnectors and fuse-combination units
50.60 Close of voting. Proof returned by secretariat
Low-voltage switchgear and controlgear - Part 4-1: Contactors and motor-starters - Electromechanical contactors and motor-starters
50.60 Close of voting. Proof returned by secretariat
Low-voltage switchgear and controlgear - Part 5-1: Control circuit devices and switching elements - Electromechanical control circuit devices
50.60 Close of voting. Proof returned by secretariat
Low-voltage switchgear and controlgear - Part 5-3: Control circuit devices and switching elements - Requirements for proximity devices with defined behaviour under fault conditions (PDDB)
50.60 Close of voting. Proof returned by secretariat
Low-voltage switchgear and controlgear - Part 5-5: Control circuit devices and switching elements - Electrical emergency stop device with mechanical latching function
50.60 Close of voting. Proof returned by secretariat
Low-voltage switchgear and controlgear - Part 5-7: Control circuit devices and switching elements - Proximity devices with analogue output
50.60 Close of voting. Proof returned by secretariat
Low-voltage switchgear and controlgear - Part 6-1: Multiple function equipment - Transfer switching equipment
50.60 Close of voting. Proof returned by secretariat
Low-voltage switchgear and controlgear - Part 6-2: Multiple function equipment - Control and protective switching devices (or equipment) (CPS)
20.60 Close of comment period
Low-voltage switchgear and controlgear - Part 7-1: Ancillary equipment - Terminal blocks for copper conductors
50.60 Close of voting. Proof returned by secretariat
Low-voltage switchgear and controlgear - Part 7-2: Ancillary equipment - Protective conductor terminal blocks for copper conductors
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Low-voltage switchgear and controlgear - Part 7-4: Ancillary equipment - PCB terminal blocks for copper conductors
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Low-voltage switchgear and controlgear - Part 9-2: Active arc-fault mitigation systems - Optical-based internal arc-detection and mitigation devices
50.60 Close of voting. Proof returned by secretariat
Rules for steam turbine thermal acceptance tests - Part 1: High accuracy for large condensing steam turbines
40.60 Close of voting
Rules for steam turbine thermal acceptance tests - Part 4: Routine testing
50.60 Close of voting. Proof returned by secretariat