Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Wearable electronic devices and technologies - Part 403-1: Test method of surface electromyography sensors on forearm and hand for wearable applications
50.60 Close of voting. Proof returned by secretariat
Wearable electronic devices and technologies - Part 801-2: Smart body area network (SmartBAN) - Low complexity medium access control (MAC) for SmartBAN
40.60 Close of voting
Photovoltaic modules - Extended-stress testing - Part 1: Modules
10.99 New project approved
Photovoltaic modules - Extended-stress testing - Part 2: Polymeric component materials
10.99 New project approved
Utility-interconnected photovoltaic inverters - Test procedure for over voltage ride-through measurements
10.99 New project approved
Management of network assets in power systems - Part 1: Overview, principles and terminology
50.60 Close of voting. Proof returned by secretariat
Management of network assets in power systems - Part 2: Risk-informed decision-making process
50.60 Close of voting. Proof returned by secretariat
Incompatibility of connectors for DC-application in photovoltaic systems
10.99 New project approved
Managing fire risk related to photovoltaic (PV) systems on buildings
10.99 New project approved
Lightning and surge voltage protection for photovoltaic (PV) power supply systems
10.99 New project approved
Measurement protocols for photovoltaic devices based on organic, dye-sensitized or perovskite materials
10.99 New project approved
Fatigue assessment of hydraulic turbine runners: from design to quality assurance
50.60 Close of voting. Proof returned by secretariat
Live working - Hand protective devices against the thermal hazards of an electric arc - Part 2: Requirements
20.60 Close of comment period
Electric motor-operated tools – Dust measurement procedure – Part 1: General requirements
30.99 CD approved for registration as DIS
Station Service Voltage Transformers (SSVT)
10.99 New project approved
Power line communication for DC shutdown equipment - Communication signal, physical layer
50.99 FDIS or proof approved for publication
Composite insulators with integrated optical fibres for AC voltages greater than 1 000 V and DC voltage greater than 1 500 V - Definitions, tests methods and acceptance criteria
10.99 New project approved
Photovoltaic power systems - Reliability practices for operation
10.99 New project approved