Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Power systems management and associated information exchange - Data and communications security - Part 8: Role-based access control for power system management
50.60 Close of voting. Proof returned by secretariat
Power systems management and associated information exchange - Interoperability in the long term - Part 102: CIM - IEC 61850 harmonization
40.20 DIS ballot initiated: 12 weeks
Hydraulic machines - Guidelines for dealing with hydro-abrasive erosion in Kaplan, Francis and Pelton turbines
40.60 Close of voting
Audio/video, information and communication technology equipment – Part 1: Safety requirements
10.99 New project approved
Characteristics of hollow pressurised and unpressurised ceramic and glass insulators for use in electrical equipment with rated voltages greater than 1000 V
10.99 New project approved
Digital addressable lighting interface -- Part 207: Particular requirements for control gear - LED modules (device type 6)
10.20 New project ballot initiated
Digital addressable lighting interface - Part 225: Particular requirements for control gear - Adaptive emergency escape lighting (device type 24)
50.60 Close of voting. Proof returned by secretariat
Radiation protection instrumentation - Dosimetry systems with integrating passive detectors for individual, workplace and environmental monitoring of photon and beta radiation
45.99 Dispatch of FV draft to CCMC
Fixed electric double-layer capacitors for use in electronic equipment - Part 2: Sectional specification - Electric double-layer capacitors for power application
50.60 Close of voting. Proof returned by secretariat
Electrical resistance trace heating systems for industrial and commercial applications - Part 1: General and testing requirements
40.60 Close of voting
Electrical resistance trace heating systems for industrial and commercial applications - Part 2: Application guide for system design, installation and maintenance
40.60 Close of voting
Nuclear power plants - Instrumentation and control important to safety - Resistance temperature detectors
40.60 Close of voting
Concentric lay stranded overhead electrical conductors containing one or more gap(s)
10.99 New project approved
Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods
40.20 DIS ballot initiated: 12 weeks
Industrial communication networks - Network and system security - Part 3-3: System security requirements and security levels
10.99 New project approved
Security for industrial automation and control systems - Part 4-1: Secure product development lifecycle requirements
40.60 Close of voting
Security for industrial automation and control systems - Part 4-2: Technical security requirements for ACS components
40.60 Close of voting
Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection
40.60 Close of voting