Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Space systems — Test procedures to evaluate spacecraft material ejecta upon hypervelocity impact
40.93 Full report circulated: decision for new DIS ballot
Ergonomics — Manual handling — Part 2: Pushing and pulling
30.60 Close of voting/ comment period
Space systems — Probabilistic risk assessment (PRA)
40.99 Full report circulated: DIS approved for registration as FDIS
Health informatics — Identification of medicinal products — Data elements and structures for the unique identification and exchange of regulated information on substances
40.60 Close of voting
Cycles — Luggage carriers for bicycles — Requirements and test methods
30.60 Close of voting/ comment period
Soil quality — Determination of phosphorus — Spectrometric determination of phosphorus soluble in sodium hydrogen carbonate solution
30.00 Committee draft (CD) registered
Soil quality — Effects of pollutants on earthworms — Part 1: Determination of acute toxicity to Eisenia fetida/Eisenia andrei and other earthworm species
40.60 Close of voting
Intelligent transport systems — Lane keeping assistance systems (LKAS) — Performance requirements and test procedures
20.00 New project registered in TC/SC work programme
Soil quality — Determination of particle size distribution in mineral soil material — Method by sieving and sedimentation
50.00 Final text received or FDIS registered for formal approval
Microbiology of the food chain — Horizontal method for the detection and enumeration of Listeria monocytogenes and of Listeria spp. — — Part 1: Detection method
30.00 Committee draft (CD) registered
Microbiology of the food chain — Horizontal method for the detection and enumeration of Listeria monocytogenes and of Listeria spp — Part 2: Enumeration method
30.00 Committee draft (CD) registered
Plastics piping systems for renovation of underground water supply networks — Part 11: Lining with inserted hoses
00.00 Proposal for new project received
Piping systems for rehabilitation of underground drains, sewers and water supply networks — Part 2: Thermoset composite materials
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Piping systems for rehabilitation of underground drains, sewers and water supply networks — Part 4: Thermoplastic composite materials
40.60 Close of voting
Piping systems for rehabilitation of underground gas supply networks — Part 5: Unplasticized Polyamide (PA-U) material
20.00 New project registered in TC/SC work programme
Plastics pipes and fittings — Plastics pipes and their constituents (all relevant materials) for renovation of underwater pipe systems — Part 5: Polyamide (PA-U) material
10.20 New project ballot initiated
Piping systems for rehabilitation of underground gas supply networks — Part 5: Polyamide (PA-U) material
10.20 New project ballot initiated