Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Road vehicles — Automotive cables — Part 3: Dimensions and requirements for 30 V a.c. or 60 V d.c. single core copper conductor cables
20.00 New project registered in TC/SC work programme
Road vehicles — Automotive cables — Part 4: Dimensions and requirements for 30 V a.c. and 60 V d.c. single core aluminium conductor cables
20.00 New project registered in TC/SC work programme
Road vehicles — Automotive cables — Part 5: Dimensions and requirements for 600 V a.c. or 900 V d.c. and 1 000 V a.c. or 1 500 V d.c. single core copper conductor cables
20.00 New project registered in TC/SC work programme
Road vehicles — Automotive cables — Part 6: Dimensions and requirements for 600 V a.c. or 900 V d.c. and 1 000 V a.c. or 1 500 V d.c. single core aluminium conductor cables
20.00 New project registered in TC/SC work programme
Road vehicles — Automotive cables — Part 7: Dimensions and requirements for 30 V a.c. or 60 V d.c. round, sheathed, screened or unscreened multi or single core copper conductor cables
20.00 New project registered in TC/SC work programme
Road vehicles — Automotive cables — Part 8: Dimensions and requirements for 30 V a.c. or 60 V d.c. round, sheathed, screened or unscreened multi or single core aluminium conductor cables
20.00 New project registered in TC/SC work programme
Road vehicles — Automotive cables — Part 9: Dimensions and requirements for 600 V a.c. or 900 V d.c. and 1 000 V a.c. or 1 500 V d.c. round, sheathed, screened or unscreened multi or single core copper conductor cables
20.00 New project registered in TC/SC work programme
Optics and photonics — Medical endoscopes and endotherapy devices --Determination of the relative spectral transmittance of rigid endoscopes in the visible light range
10.60 Close of voting
Endoscopes - Determination of the luminous energy transfer efficiency
00.00 Proposal for new project received
Endoscopes — Determination of the edge brightness reduction of illumination
00.00 Proposal for new project received
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management — Part 1: Concepts and principles
40.20 DIS ballot initiated: 12 weeks
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management — Part 2: Information management process
40.20 DIS ballot initiated: 12 weeks
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management — Part 3: Implementation of the information management process
40.00 DIS registered
Railway applications — Heating, ventilation and air conditioning systems for rolling stock — Part 1: Terms and definitions
10.99 New project approved
Crimped joints for aircraft electrical cables
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Dispersion characterization other than particle sizing by sedimentation and separation methods — Part 1: Two-dimensional characterization of particles by analytical ultracentrifugation (AUC)/analytical centrifugation (AC) based on the Lamm equation
00.00 Proposal for new project received
Dispersion characterisation other than particle sizing by sedimentation and separation methods — Part 2: Rheological parameters based on particle migration velocity
20.00 New project registered in TC/SC work programme
Additional lubricants for male natural rubber latex condoms — Effect on condom strength
40.00 DIS registered