Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Interpreting services — General requirements and recommendations
40.60 Close of voting
Digital imaging — Image flare measurement — Part 2: Angle dependent image flare
00.00 Proposal for new project received
Digital imaging — Image flare measurement — Part 2: Angle dependent image flare
20.60 Close of comment period
Plastics piping systems — Glass-reinforced thermosetting plastics (GRP) pipes and fittings — Test method to prove the structural design of fittings
20.00 New project registered in TC/SC work programme
Water quality — Determination of selected alkylphenols — Part 1: Method for non-filtered samples using liquid-liquid extraction and gas chromatography with mass selective detection
20.00 New project registered in TC/SC work programme
Hydraulic fluid power — Test methods for couplings actuated with or without tools
50.00 Final text received or FDIS registered for formal approval
Coalbed methane exploration and development — Part 00: Terms and definitions
10.60 Close of voting
Gas turbine combined cycle power plants — Thermal performance tests
40.60 Close of voting
Protective gloves for pesticide operators and re-entry workers — Performance requirements
40.00 DIS registered
Fasteners — Vocabulary — Part 1: Designations of fasteners and their features
10.99 New project approved
Fasteners — Vocabulary — Part 2: Coatings
50.00 Final text received or FDIS registered for formal approval
Imaging materials — Image permanence specification of reflection photographic prints— — Part 2: Part 2: Evaluation point
30.60 Close of voting/ comment period
Imaging materials — Reflection colour photographic prints — Test print construction and measurement
20.00 New project registered in TC/SC work programme
Plastics — Determination of the aerobic biodegradation of plastic materials exposed to seawater using accelerated conditions in laboratory
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Glass in building — Interlayer films for laminated glass and laminated safety glass
40.60 Close of voting
Information and documentation — Records risks — Risk assessment for records management
10.20 New project ballot initiated