Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Gears — Thermal capacity — Part 2: Thermal load-carrying capacity
20.00 New project registered in TC/SC work programme
Implants for surgery — Wear of total hip-joint prostheses — Part 1: Loading and displacement parameters for wear-testing machines and corresponding environmental conditions for test
20.99 WD approved for registration as CD
Implants for surgery — Wear of total hip-joint prostheses — Part 3: Loading and displacement parameters for orbital bearing type wear testing machines and corresponding environmental conditions for test
00.00 Proposal for new project received
Implants for surgery — Wear of total hip-joint prostheses — Part 4: Testing hip prostheses under variations in component positioning which results in direct edge loading
00.00 Proposal for new project received
Implants for surgery — Wear of total knee-joint prostheses — Part 1: Methodology for simulator wear testing of tibio-femoral joints under force control
30.60 Close of voting/ comment period
Implants for surgery — Wear of total knee-joint prostheses — Part 3: Methodology for simulator wear testing of tibio-femoral joints under displacement control.
30.60 Close of voting/ comment period
Implants for surgery — Wear of total knee prostheses — Part 5: Durability performance of the patellofemoral joint
00.00 Proposal for new project received
Geometrical product specifications (GPS) — Inspection by measurement of workpieces and measuring equipment — Part 2: Guidance for the estimation of uncertainty in GPS measurement, in calibration of measuring equipment and in product verification
00.00 Proposal for new project received
Geometrical product specifications (GPS) — Inspection by measurement of workpieces and measuring equipment — Part 6: Generalized decision rules for the acceptance and rejection of instruments and workpieces
00.00 Proposal for new project received
Industrial automation systems and integration - JT file format specification for 3D visualization — Part 2: Vocabulary
00.00 Proposal for new project received
Oil and gas industries including lower carbon energy — Downhole equipment — Packers and bridge plugs
30.99 CD approved for registration as DIS
Mineral and sapphire watch-glasses — Part 5: Anti-fingerprint treatment
20.00 New project registered in TC/SC work programme
Soil quality — Acid-base accounting procedure for acid sulfate soils — Part 1: Introduction and definitions, symbols and acronyms, sampling and sample preparation
30.99 CD approved for registration as DIS
Soil quality — Acid-base accounting procedure for acid sulfate soils — Part 2: Chromium reducible sulfur (CRS) methodology
30.99 CD approved for registration as DIS
Soil quality — Acid-base accounting procedure for acid sulfate soils — Part 3: Suspension peroxide oxidation combined acidity and sulfur (SPOCAS) methodology
30.99 CD approved for registration as DIS
Earth-moving machinery — Field of vision of surveillance and rear-view mirrors — Part 1: Test methods
20.00 New project registered in TC/SC work programme
Earth-moving machinery — Field of vision of surveillance and rear-view mirrors — Part 2: Performance criteria
20.00 New project registered in TC/SC work programme