Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Holding fixtures of cylindrical abrasive sleeves — Part 1: Holding fixtures with shank for hand-held grinding machines
30.20 CD study/ballot initiated
Intelligent transport systems — Framework for collaborative Telematics Applications for Regulated commercial freight Vehicles (TARV) — Part 1: Framework and architecture
50.00 Final text received or FDIS registered for formal approval
Intelligent transport systems – Framework for cooperative telematics applications for regulated commercial freight vehicles (TARV) — Part 26: Part 26: Electric vehicle dynamic charging monitoring
00.00 Proposal for new project received
Intelligent transport systems — Framework for collaborative telematics applications for regulated commercial freight vehicles (TARV) — Part 27: Operation status monitoring for fleets using automated driving
40.20 DIS ballot initiated: 12 weeks
Intelligent transport systems — Framework for cooperative telematics applications for regulated commercial freight vehicles (TARV) — Part 28: Tractor-trailer interoperability system
00.00 Proposal for new project received
Standardization of injection sites for different animal species — Part 3: Domesticated ruminants (domesticated species of the bovidae, cervidae and camelidae families)
40.20 DIS ballot initiated: 12 weeks
Road construction and maintenance equipment — Asphalt mixing plants — Terminology and commercial specifications
30.60 Close of voting/ comment period
Re-sintering test for UO2, (U,Gd)O2 and (U,Pu)O2 pellets
30.00 Committee draft (CD) registered
Metallic materials — Method of test for the determination of quasistatic fracture toughness of welds
40.00 DIS registered
Buildings and civil engineering works — Service life planning — Part 1: General principles and framework
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Buildings and civil engineering works — Service life planning — Part 2: Process considerations
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Buildings and civil engineering works — Service life planning — Part 3: Methods, data and communication
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Road construction and maintenance equipment — Powder binder spreaders — Terminology and commercial specifications
30.60 Close of voting/ comment period
Leather — Tests for colour fastness — Colour fastness to machine washing
40.00 DIS registered
Leather — Tests for colour fastness — Colour fastness to mild washing
40.00 DIS registered
Stationary source emissions — Sampling and determination of gaseous fluoride content
30.20 CD study/ballot initiated
Method of evaluating the UV dose to airborne microorganisms transiting in-duct ultraviolet germicidal irradiation devices
30.99 CD approved for registration as DIS