Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Methods for the calibration of vibration and shock transducers — Part 18: Low-frequency calibration by rotation in earth's gravitational field
20.60 Close of comment period
Methods for the calibration of vibration and shock transducers — Part 21: Vibration calibration by comparison to a reference transducer
00.00 Proposal for new project received
Methods for the calibration of vibration and shock transducers — Part 41: Calibration of laser vibrometers
00.00 Proposal for new project received
Methods for the calibration of vibration and shock transducers — Part 46: Part 46: Low-frequency calibration by machine vision systems
00.60 Close of review
Guidelines for treated wastewater use for irrigation projects — Part 8: Reservoirs
40.20 DIS ballot initiated: 12 weeks
Condition monitoring and diagnostics of wind turbines — Part 3: Monitoring the structure
40.20 DIS ballot initiated: 12 weeks
Vapour vacuum pumps — Measurement of performance characteristics — Part 1: Measurement of volume rate of flow (pumping speed)
00.00 Proposal for new project received
Vapour vacuum pumps — Measurement of performance characteristics — Part 2: Measurement of critical backing pressure
00.00 Proposal for new project received
Implants for surgery — Roentgen stereophotogrammetric analysis for the assessment of migration of orthopaedic implants
00.00 Proposal for new project received
Machine tools safety — Machining centres, milling machines, transfer machines — Part 1: Safety requirements
20.20 Working draft (WD) study initiated
Machine tools safety — Presses — Part 1: General safety requirements
30.60 Close of voting/ comment period
Water quality — Analysis of microplastic in water — Part 1: General
30.00 Committee draft (CD) registered
Water quality — Analysis of microplastic in water — Part 3: Thermo-analytical methods for waters with low content of suspended solids including drinking water
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Water quality — Analysis of microplastic in water — Part 4: Sample preparation for analysis of microplastics in water
30.00 Committee draft (CD) registered
Ground vulcanized rubber, crumb, powdered rubber - Evaluation procedures
30.60 Close of voting/ comment period
Packaging — Transport packaging for dangerous goods — Conditions of use for recycled plastics material
40.60 Close of voting
Hydrogen generators using fuel processing technologies — Part 2: Test methods for performance
40.00 DIS registered
Nuclear criticality safety — Estimation of the number of fissions of a postulated criticality accident — Amendment 1
60.00 Standard under publication