Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Soil quality — Determination of selected organotin compounds — Gas-chromatographic method
20.00 New project registered in TC/SC work programme
Sustainable mobility and transportation — Smart operation and maintenance — Part 1: Service role architecture
50.00 Final text received or FDIS registered for formal approval
Sustainable mobility and transportation — Smart operation and maintenance — Part 2: Principles and requirements based on management process
00.00 Proposal for new project received
Sustainable mobility and transportation — Smart operation and maintenance — Part 3: Evaluation and improvement based on maturity model
00.00 Proposal for new project received
Traditional Chinese medicine — Determination of selected Aconitum alkaloids by high-performance liquid chromatography (HPLC)
40.00 DIS registered
Traditional Chinese medicine — Lycium barbarum and Lycium chinense fruit
40.00 DIS registered
Enterprise modelling and architecture — Constructs for Service Modelling
00.60 Close of review
Uncoupling membranes/matting for ceramic tile installation
20.00 New project registered in TC/SC work programme
Industrial automation systems and integration — Numerical control systems for machine tools — Part 3: Safety guidelines for NC system
20.00 New project registered in TC/SC work programme
Industrial automation systems and integration — Numerical control systems for machine tools — Part 4: Intelligent function requirements of NC system
10.20 New project ballot initiated
Industrial automation systems and integration — Numerical control systems for machine tools — Part 4: Intelligent function requirements of NC system
00.00 Proposal for new project received
Natural gas — Format for data from gas chromatograph analysers for natural gas — XML file format
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Drilling and foundation machinery — Horizontal directional drilling (HDD) machines — Safety requirements and verification
50.00 Final text received or FDIS registered for formal approval
Road vehicles — Vehicle domain service (VDS) — Part 2: Application layer and sequence requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 2: Application layer and sequence requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 3: Network and transport layer requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 3: Network and transport layer requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 4: Physical and data link layer requirements
00.00 Proposal for new project received