Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs Certification body: sertifikaciono.telo@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

Projects

Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard

Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 1: Minimum requirements prior and after weathering and climatic testing

40.99   Full report circulated: DIS approved for registration as FDIS

ISO/TC 35/SC 9 more

Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 2: Determination and evaluation of resistance to rain erosion using rotating arm

30.60   Close of voting/ comment period

ISO/TC 35/SC 9 more

Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 5: Measurement of transmittance properties of UV protective coatings

20.20   Working draft (WD) study initiated

ISO/TC 35/SC 9 more

Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 7: Determination and evaluation of resistance to hail

30.99   CD approved for registration as DIS

ISO/TC 35/SC 9 more

Paints and varnishes — Coating systems for wind-turbine rotor blades — Part 9: Determination and evaluation of ice adhesion using shear test.

30.99   CD approved for registration as DIS

ISO/TC 35/SC 9 more

Footwear sizing — In-shoe measurement — Part 2: Part 2: Technical Ball Girth and ball width

10.99   New project approved

ISO/TC 137 more

Structures for mine shafts — Part 6: Design of shaft lining

20.60   Close of comment period

ISO/TC 82 more

Building construction machinery and equipment — Portable, hand-held, internal combustion engine-driven abrasive cutting machines — Part 2: Safety requirements for machines for abrasive chains

50.00   Final text received or FDIS registered for formal approval

ISO/TC 195 more

Quality management systems — Specific requirements for the application of ISO 9001:2015 by organizations in the supply chain of the nuclear energy sector supplying products and services important to nuclear safety (ITNS)

40.00   DIS registered

ISO/TC 85 more

Planning for functional performance testing for building commissioning — Part 2: Air-handling unit fan, system and associated controls

10.20   New project ballot initiated

ISO/TC 205 more

Determination of rare earth impurity contents in individual rare earth metals and their oxides — Inductively coupled plasma mass spectrometry Part 1: Determination of rare earth impurity contents in individual La, Ce, Pr, Nd, Sm metals and their oxides

20.99   WD approved for registration as CD

ISO/TC 298 more

Intelligent transport systems — Data interfaces between centres for transport information and control systems — Platform-independent model specifications for data exchange protocols for transport information and control systems

10.99   New project approved

ISO/TC 204 more

Monitoring and mitigation of fire laboratory emissions

30.60   Close of voting/ comment period

ISO/TC 92/SC 3 more

Machinery for forestry — Winches — Part 1: Dimensions, performance and safety

40.60   Close of voting

ISO/TC 23/SC 15 more

Polyethylene pipes and fittings for the supply of gaseous fuels or water — Training and assessment of fusion operators

50.00   Final text received or FDIS registered for formal approval

ISO/TC 138/SC 4 more

Intelligent transport systems — Highly Automated Motorway Chauffeur Systems (HMCS)

50.00   Final text received or FDIS registered for formal approval

ISO/TC 204 more

Intelligent transport systems – Acceleration control for pedal error (ACPE) — Performance requirements and test procedures

00.00   Proposal for new project received

ISO/TC 204 more

Intelligent transport systems ― Acceleration control for pedal error(ACPE) ― Performance requirements and test procedures

20.20   Working draft (WD) study initiated

ISO/TC 204 more