Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Gaseous hydrogen — Fuelling protocols for hydrogen-fuelled vehicles — Part 6: Part 6: Conformance test for communication requirements between the vehicle and dispenser control systems
10.20 New project ballot initiated
Hydrogen technologies — General hydrogen station requirements
20.00 New project registered in TC/SC work programme
Gaseous Hydrogen — Fuel system components for hydrogen-fuelled vehicles — Part 2: Rail vehicles
30.92 CD referred back to Working Group
Hydrogen Technologies — Aerial Vehicles — Part 1: Liquid Hydrogen Fuel Storage System
20.00 New project registered in TC/SC work programme
Hydrogen technologies — Interoperability — Part 1: Interface between gaseous hydrogen trailer and hydrogen fuelling station
50.00 Final text received or FDIS registered for formal approval
General requirements for offshore structures
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Oil and gas industries including lower carbon energy — Specific requirements for offshore structures — Part 9: Structural integrity management
30.99 CD approved for registration as DIS
Oil and gas industries including lower carbon energy — Fixed steel offshore structures
30.99 CD approved for registration as DIS
Petroleum and natural gas industries — Concrete offshore structures
00.00 Proposal for new project received
Petroleum and natural gas industries including lower carbon energy — Floating offshore structures — Ship-shaped, semi-submersible, spar and shallow-draught cylindrical structures
20.00 New project registered in TC/SC work programme
Oil and gas industries including lower carbon energy — Site-specific assessment of mobile offshore units — Part 2: Jack-ups commentary and detailed sample calculation
20.00 New project registered in TC/SC work programme
Glass in building — Vacuum insulating glass — Part 1: Basic specification of products and evaluation methods for performance
40.60 Close of voting
Glass in building — Vacuum insulating glass — Part 4: Pendulum impact testing and classification of safety glass
00.00 Proposal for new project received
Meteorology — Weather radar — Part 1: System performance and operation
10.99 New project approved
Fibre-reinforced plastic composites — Determination of interlaminar strength and modulus by double beam shear test
30.60 Close of voting/ comment period
Plastics — Temperature modulated DSC — Part 4: Quasi isothermal measurement of specific heat capacity
20.00 New project registered in TC/SC work programme
Acoustics — Description, measurement and assessment of environmental noise — Part 1: Basic quantities and assessment procedures
00.00 Proposal for new project received
Acoustics — Description, measurement and assessment of environmental noise — Part 2: Determination of sound pressure levels
00.00 Proposal for new project received