Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Footwear — Critical substances potentially present in footwear and footwear components --Per and polyfluoroalkyl substances (PFAS) — Part 2: Determination of volatile compound by solvent extraction and gas chromatography
30.00 Committee draft (CD) registered
Textiles – Determination of colour fastness grades by mobile computing devices
00.00 Proposal for new project received
Nanotechnologies — Nano-emulsions — Specifications of core characteristics and measurement methods
20.00 New project registered in TC/SC work programme
Road sweepers — Performance requirements and test methods
50.00 Final text received or FDIS registered for formal approval
Rolling bearings — Insert bearing units — Part 1: Geometrical product specifications (GPS) and tolerance values for insert bearings and eccentric locking collars
20.00 New project registered in TC/SC work programme
Rolling bearings — Insert bearing units — Part 2: Geometrical product specifications (GPS) and tolerance values for cast and pressed housings
20.00 New project registered in TC/SC work programme
Rolling bearings — Insert bearing units — Part 3: Boundary dimensions for mounting
30.60 Close of voting/ comment period
Spices and condiments — Whole, cut and ground Lemongrass — Specification
40.20 DIS ballot initiated: 12 weeks
Health risk assessment and management of high-quality reuse of treated greywater during natural disasters, emergencies and crises
30.60 Close of voting/ comment period
Classification and Specification of Thermal Spray Seal Coatings for Gas Turbines — Low-temperature Applications
20.60 Close of comment period
Sustainable mobility and transportation — Photovoltaic power supply management for mobility — Part 1: Role model
50.00 Final text received or FDIS registered for formal approval
Sustainable mobility and transportation — Photovoltaic power supply management for mobility — Part 2: Data and platform
10.60 Close of voting
Prefabricated Building - Modular Building - Kitchen and Bathroom
30.20 CD study/ballot initiated
Guidelines for hospital internal logistics services using autonomous mobile robots for the delivery of pharmaceuticals
40.20 DIS ballot initiated: 12 weeks
Automation systems and integration — Core vocabulary for simulation data management
50.00 Final text received or FDIS registered for formal approval
Automation systems and integration — Industrial digital twin interface architecture
60.00 Standard under publication