Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Intelligent transport systems — Minimal risk manoeuvre (MRM) for automated driving — Part 1: Framework, straight-stop and in-lane stop
00.00 Proposal for new project received
Intelligent transport systems — Minimal risk manoeuvre (MRM) for automated driving — Part 2: Road shoulder stop — Minimum requirements and test procedures
30.60 Close of voting/ comment period
Intelligent transport systems — Minimal Risk Maneuver (MRM) for automated driving — Part 2: Requirements and test procedures for stopping without lane change control
00.00 Proposal for new project received
Intelligent transport systems — Minimal risk manoeuvre for automated driving — Part 2: Road shoulder stop — Minimum requirements and test procedures
10.00 Proposal for new project registered
Intelligent transport systems — Extracting trip data via nomadic device for estimating CO2 emissions — Part 3: Carbon footprint determination for trading emission reductions in eco-routing platforms
30.60 Close of voting/ comment period
Intelligent transport systems — Extracting trip data using nomadic and mobile devices for estimating CO2 emissions — Part 4: Methodology for Estimating Greenhouse Gas Emissions in the Transport Sector
10.20 New project ballot initiated
Intelligent transport syste Extracting trip data using nomadic and mobile devices for estimating CO2 emissions — Part 4: Methodology for Estimating Greenhouse Gas Emissions in the Transport Sector
10.60 Close of voting
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 2: Thermoset composite materials
30.99 CD approved for registration as DIS
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 4: Thermoplastic composite materials
30.92 CD referred back to Working Group
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 5: Unplasticized Polyamide (PA-U) material
10.99 New project approved
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 5: Polyamide (PA- U) material
10.20 New project ballot initiated
Geometrical product specifications (GPS) — Association — Basic concepts
50.00 Final text received or FDIS registered for formal approval
Plastics piping systems for pressure and non-pressure water supply, drainage or sewerage — Glass-reinforced thermosetting plastics (GRP) systems based on unsaturated polyester (UP) resin
20.00 New project registered in TC/SC work programme
Preparation of metallographic specimens used for porosity determination
10.99 New project approved
Mobile machinery — High speed interconnect (HSI) — Part 1: General information and vocabulary
20.00 New project registered in TC/SC work programme
Mobile machinery — High speed interconnect (HSI) — Part 10: Communication channel
50.00 Final text received or FDIS registered for formal approval
Mobile machinery — High speed interconnect (HSI) — Part 2: System and network architecture
20.00 New project registered in TC/SC work programme
Mobile machinery — High speed interconnect (HSI) — Part 3: Single communication channel coupling connector
50.00 Final text received or FDIS registered for formal approval