Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Carbon dioxide capture, transportation and storage — Vocabulary — Cross cutting terms
40.20 DIS ballot initiated: 12 weeks
Carbon dioxide capture — Part 1: Performance evaluation methods for post-combustion CO2 capture integrated with a power plant
00.00 Proposal for new project received
Mineral carbonation — Quantification of CO2 captured through mineral carbonation technology
20.60 Close of comment period
Evaluation of Candidate Existing Fossil Fuel Facilities Suitable for CCS Retrofitting
20.00 New project registered in TC/SC work programme
Carbon dioxide capture - Overview of carbon capture technologies in biomass utilisation
20.00 New project registered in TC/SC work programme
Traceability of Carbon data in CCS Chain Based on Blockchain
20.00 New project registered in TC/SC work programme
Metering, Measurement and Quantification Issues Arising Between and Across Elements of a Carbon Dioxide Capture, Transport and Storage Supply Chain
20.00 New project registered in TC/SC work programme
Carbon dioxide capture, transportation, and geological storage – Loading and offloading of CO2 at port facilities
20.00 New project registered in TC/SC work programme
Numerical running ductile fractures assessments
00.00 Proposal for new project received
Transitioning oil and gas production assets to storage
00.00 Proposal for new project received
Emission monitoring and management for amine-based post-combustion CO2 capture plants
20.00 New project registered in TC/SC work programme
Ships and marine technology — Electronic port clearance (EPC) — Part 2: Data elements for ship operations
30.99 CD approved for registration as DIS
Security and resilience — Security management systems — Guidelines for the application and implementation of ISO 28000 in the supply chain
30.60 Close of voting/ comment period
Security and resilience ― Security management systems ― Guidelines on security management system (SMS) processes
40.99 Full report circulated: DIS approved for registration as FDIS
Rolling bearings — Dynamic load ratings and rating life — Amendment 1
40.60 Close of voting