Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Ageing societies — Ageing-inclusive digital economy — Part 2: Part 2: Checklist
20.20 Working draft (WD) study initiated
Fine bubble technology — Domestic applications — Part 2: Technical specification of fine bubble properties for showerheads and faucets
00.99 Approval to ballot proposal for new project
Mechanical products design optimization and documentation — Part 1: Framework
30.60 Close of voting/ comment period
Mechanical products design optimization and documentation — Part 2: Topology Optimization
20.00 New project registered in TC/SC work programme
Mechanical products design optimization and documentation — Part 3: Parameter optimization
20.00 New project registered in TC/SC work programme
Ergonomics — Process for the integration of wearable physical assistive devices (exoskeletons) — Expression of needs selection, design, assessment and deployment
40.20 DIS ballot initiated: 12 weeks
Petroleum and related products-Determination of the ignition quality of diesel fuels — Air flow regulation method
40.99 Full report circulated: DIS approved for registration as FDIS
Oil and gas industries including lower carbon energy — Composite coiled tubing with embedded cables
50.00 Final text received or FDIS registered for formal approval
General technical requirements for mining cable hooks
50.00 Final text received or FDIS registered for formal approval
Underwater acoustics — Framework for standard-target calibration of active sonars
10.99 New project approved
Underwater acoustics — Standard-target method of calibrating active sonars for imaging and measuring scattering
00.00 Proposal for new project received
Underwater acoustics — Verification and validation of sound propagation models
00.00 Proposal for new project received
Underwater acoustics — Part 1: Verification of Ambient Sound Maps
00.00 Proposal for new project received
Underwater acoustics — Part 2: Validation of Ambient Sound Maps
00.00 Proposal for new project received
Liquid hydrogen — Land vehicle refuelling connection devices
30.60 Close of voting/ comment period
Sustainable mobility and transportation — Digital scheduling service
40.99 Full report circulated: DIS approved for registration as FDIS
Sustainable mobility and transportation — Mobility services using AI and big data — Part 1: Role model
40.20 DIS ballot initiated: 12 weeks