Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Space systems --Operational requirements for attitude and orbit control of spacecraft utilizing continuous low-thrust propulsion
10.99 New project approved
Determination of carbon dioxide content of steel slag during carbonation fixation
10.60 Close of voting
Railway Applications — Guidance on mainline operating rules of digital radio communication for train dispatching
10.60 Close of voting
Smart hospitals - Management of medical imaging intelligent examination
00.00 Proposal for new project received
General Requirements for Flight Control System of Uncrewed Electric Vertical Take-off and LandingAircraft (eVTOL)
20.00 New project registered in TC/SC work programme
Machines and plants for the manufacture, treatment and processing of hollow glass — Gob forming equipment
10.60 Close of voting
Plastics piping systems — Polyethylene piping materials and components — Determination of volatile content
20.00 New project registered in TC/SC work programme
Test Methods for Temperature Coefficient of Refractive Index of Infrared Optical materials
00.00 Proposal for new project received
Light gauge metal containers — Measurement of dimensions — Part 1: Twist-off caps
10.60 Close of voting
Light gauge metal containers — Measurement of dimensions — Part 2: Easy-open ends and peel-off ends
10.60 Close of voting
Corrosion of metals and alloys --Waterline Corrosion Test: Coupled Multielectrode Array Method
10.60 Close of voting
Plastics — Determination of combined aerobic and anaerobic biodegradation in seawater and sediment conditions — Method by analysis of evolved carbon dioxide and methane
10.60 Close of voting
Plastics -Determination of the ultimate aerobic biodegradability of plastic materials in soil by microbial enrichment under accelerated conditions
10.60 Close of voting
Children’s rights — Child helpline management systems — Requirements
10.00 Proposal for new project registered
Distributed Ledger technology — Governance Framework for Managing Agent Trustworthiness
10.60 Close of voting
Process to assess CO2 eq footprint related to cementing fluids
00.00 Proposal for new project received
Information and documentation - Methods of binding in information identification
20.00 New project registered in TC/SC work programme