Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Energy performance of building systems — Underfloor air distribution systems — Part 2: In-situ measurement of room air stratification
00.60 Close of review
Plastics-coated fabrics for upholstery — Part 3: Specification for polyurethane-coated woven fabrics
40.60 Close of voting
Road vehicles — Electrical disturbances from conduction and coupling — Part 2: Electrical transient conduction along supply lines only — Amendment 1
10.99 New project approved
Halogenated isobutene-isoprene rubber (BIIR and CIIR) — Evaluation procedures
40.99 Full report circulated: DIS approved for registration as FDIS
Evaluation method for chronic inhalation toxicity based on lung burden of nanomaterials
10.99 New project approved
Agricultural field operations data — Part 1: Core concepts
10.20 New project ballot initiated
Agricultural field operations data — Part 2: Observations and measurements
00.00 Proposal for new project received
Agricultural field operations data — Part 3: Irrigation operations
00.00 Proposal for new project received
Workplace air — Size fraction definitions for measurement of airborne particles
20.00 New project registered in TC/SC work programme
Acoustics — Measurement of airborne noise emitted by information technology and telecommunications equipment
20.00 New project registered in TC/SC work programme
Styrene-butadiene rubber, raw — Soap and organic-acid content — Part 2: Qualitative analysis
40.20 DIS ballot initiated: 12 weeks
Metallic materials — Sheet and strip 3 mm thick or less — Reverse bend test
40.60 Close of voting
Safety of machinery — Rules for drafting and presentation of safety standards
20.00 New project registered in TC/SC work programme
Energy audits — Requirements with guidance for use — Part 1-4: -2: Buildings -3: Processes (industrial, manufacturing and other processes) -4: Transport
10.20 New project ballot initiated
Building information modelling — Level of information need — Part 2: Guidance for application
50.00 Final text received or FDIS registered for formal approval
Building information modelling — Level of information need — Part 3: Data model and schema
40.60 Close of voting
Determination of chlorophyll content of green tea — Spectrometric method
00.00 Proposal for new project received