Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Refractory products — Determination of modulus of rupture at elevated temperatures
50.00 Final text received or FDIS registered for formal approval
Shaped refractory products — Sampling and acceptance testing
00.00 Proposal for new project received
Industrial trucks — Vocabulary — Part 4: Operating and descriptive terms
00.00 Proposal for new project received
Biotechnology — Genome editing — Part 1: Vocabulary
20.00 New project registered in TC/SC work programme
Rubber latex, natural, concentrate — Determination of volatile fatty acid number
40.20 DIS ballot initiated: 12 weeks
Road vehicles — Safety for automated driving systems — Design, verification and validation
20.20 Working draft (WD) study initiated
Guidelines for synergy between business support organizations (BSOs) and standards development organizations (SDOs)
10.99 New project approved
Dentistry — Accuracy of CAD/CAM additive manufactured dental products — Part 1: Polymeric materials with vat photopolymerization technology
20.60 Close of comment period
Road vehicles — Guidelines for auditing cybersecurity engineering
50.00 Final text received or FDIS registered for formal approval
Acoustics — Determination of uncertainties associated with sound emission measures — Part 1: Sound power levels determined from sound pressure measurements
10.00 Proposal for new project registered
Health informatics — Categorial structure of representation for evaluation of clinical practice guidelines of traditional Chinese medicine
30.99 CD approved for registration as DIS
Information and documentation — Foundation and vocabulary
20.00 New project registered in TC/SC work programme
Acoustics — Measurements of sound pressure level emitted by stationary road vehicles
30.60 Close of voting/ comment period
Oil and gas industries including lower carbon energy - Protective system requirements for fired equipment
50.00 Final text received or FDIS registered for formal approval
Refrigerating systems and heat pumps — Safety and environmental requirements — Part 1: Vocabulary
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Refrigerating systems and heat pumps — Safety and environmental requirements — Part 2: Design, construction, testing, marking and documentation
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Refrigerating systems and heat pumps — Safety and environmental requirements — Part 3: Installation site, classification and selection criteria
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks