Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Tools for pressing — Guide bushes — Part 7: Form F, ball cage bushes, flanged, type 1
30.92 CD referred back to Working Group
Tools for pressing — Guide bushes — Part 8: Form G, gliding bushes, stepped, type 1
30.99 CD approved for registration as DIS
Tools for pressing — Guide bushes — Part 9: Form B, ball cage bushes, plain, type 2
30.99 CD approved for registration as DIS
Soft soldering fluxes — Test methods — Part 8: Determination of zinc content
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Solar heating — Domestic water heating systems — Part 2: Outdoor test methods for system performance characterization and yearly performance prediction of solar-only systems
20.00 New project registered in TC/SC work programme
Hydraulic fluid power — Identification of valve ports, subplates, control devices and solenoids
30.60 Close of voting/ comment period
Railway applications — Coating of passenger rail vehicles
00.00 Proposal for new project received
Air cargo equipment — Unit load devices for transportation of horses
10.99 New project approved
Health informatics — Personalized health navigation — Part 10000: Architecture
00.00 Proposal for new project received
Health informatics — Personalized health navigation — Part 10200: Architecture: Purpose-oriented self-health activities
00.00 Proposal for new project received
Health informatics — Personalized health navigation — Part 20100: Application: Food and nutrition
20.00 New project registered in TC/SC work programme
Language resource management — Vocabulary
40.99 Full report circulated: DIS approved for registration as FDIS
Iron ores — Determination of water-soluble chloride — Ion-selective electrode method
30.99 CD approved for registration as DIS
Forestry machinery — Portable chain-saws — Kickback test
50.00 Final text received or FDIS registered for formal approval
Ships and marine technology — Wire rope lifting platform for inspection
10.20 New project ballot initiated
Solar energy — Methods of testing preformed rubber seals and sealing compounds used in collectors
20.20 Working draft (WD) study initiated
Fibre ropes — General specifications
20.00 New project registered in TC/SC work programme