Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Nuclear power plants - Instrumentation and control important to safety - Methods for assessing the performance of safety system instrument channels
20.99 WD approved for registration as CD
Digital addressable lighting interface - Part 225: Particular requirements for control gear - Adaptive emergency escape lighting (device type 24)
50.00 Final text received or FDIS registered for formal approval
Amendment 1 - Maritime navigation and radiocommunication equipment and systems - Shipborne radar - Performance requirements, methods of testing and required test results
30.20 CD study/ballot initiated
Obsolescence management Part 1: Policy, plan and process
30.60 Close of voting/ comment period
Obsolescence Management Part 2: Forecasting obsolescence cost
30.60 Close of voting/ comment period
Obsolescence Management Part 3: Exchange of information regarding change and discontinuance of products
30.99 CD approved for registration as DIS
Type F and type B residual current operated circuit-breakers with and without integral overcurrent protection for household and similar uses
30.99 CD approved for registration as DIS
Type F and type B residual current operated circuit-breakers with and without integral overcurrent protection for household and similar uses
40.00 DIS registered
EMC IC modelling - Part 3-1: Description of ICEM-RE macro-model extraction using only the magnitude of near-field data
30.20 CD study/ballot initiated
EMC IC modelling - Part 4: Models of integrated circuits for RF immunity behavioural simulation - Conducted immunity modelling (ICIM-CI)
30.20 CD study/ballot initiated
Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods
30.20 CD study/ballot initiated
Industrial communication networks - High availability automation networks - Part 2: Media Redundancy Protocol (MRP)
30.20 CD study/ballot initiated
Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)
30.20 CD study/ballot initiated
Security for automation and control systems – Part 1-1: Overview and Guidance for the IEC 62443 Series
30.60 Close of voting/ comment period
Security for industrial automation and control systems - Part 2-4: Security program requirements for IACS service providers
30.60 Close of voting/ comment period
Security for industrial automation and control systems - Part 4-1: Secure product development lifecycle requirements
30.60 Close of voting/ comment period
Security for Automation and Control Systems - Part 6-1: Security evaluation methodology for IEC 62443-2-4
30.99 CD approved for registration as DIS
Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection
40.99 Full report circulated: DIS approved for registration as FDIS