Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Power System Stability Control - Part 2: Guideline for quantitative assessment of power system stability and security
60.00 Standard under publication
Hybrid CPV/PV modules: General characteristics and measurement procedures - Part 1: Performance measurements and power rating - Irradiance and temperature
40.20 DIS ballot initiated: 12 weeks
Technical Specifications for Digitalization of Operation and Maintenance in Hydropower Assets
20.99 WD approved for registration as CD
Sustainable management of waste electrical and electronic equipment (e-waste) (Proposed Horizontal Publication)
50.60 Close of voting. Proof returned by secretariat
Black start of hydropower plant
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Energy efficiency - Customer energy management systems - Part 2-1: Data model and messaging - Interface between the distribution system operator/ energy management gateway and customer energy manager/ building energy manager (Proposed horizontal publication)
20.99 WD approved for registration as CD
Energy efficiency - Customer energy management systems - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource manager(s) (Proposed horizontal publication)
50.00 Final text received or FDIS registered for formal approval
Energy Efficiency - Customer Energy Management Systems - Part 3: Energy Manager (Proposed horizontal publication)
20.99 WD approved for registration as CD
High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"
30.99 CD approved for registration as DIS
Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)
30.99 CD approved for registration as DIS
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements
40.00 DIS registered
Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment
20.99 WD approved for registration as CD
Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 4: Interface protection and fault ride through
20.99 WD approved for registration as CD
Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances
40.00 DIS registered
Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 6: Power control functions and grid support
30.99 CD approved for registration as DIS
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 7: Remote configuration, control and monitoring
30.99 CD approved for registration as DIS
Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing
30.20 CD study/ballot initiated