Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

Projects

Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard

Power System Stability Control - Part 2: Guideline for quantitative assessment of power system stability and security

60.00   Standard under publication

TC 8/SC 8C more

Hybrid CPV/PV modules: General characteristics and measurement procedures - Part 1: Performance measurements and power rating - Irradiance and temperature

40.20   DIS ballot initiated: 12 weeks

TC 82 more

Technical Specifications for Digitalization of Operation and Maintenance in Hydropower Assets

20.99   WD approved for registration as CD

TC 4 more

Sustainable management of waste electrical and electronic equipment (e-waste) (Proposed Horizontal Publication)

50.60   Close of voting. Proof returned by secretariat

TC 111 more

Black start of hydropower plant

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 4 more

Energy efficiency - Customer energy management systems - Part 2-1: Data model and messaging - Interface between the distribution system operator/ energy management gateway and customer energy manager/ building energy manager (Proposed horizontal publication)

20.99   WD approved for registration as CD

TC 23/SC 23K more

Energy efficiency - Customer energy management systems - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource manager(s) (Proposed horizontal publication)

50.00   Final text received or FDIS registered for formal approval

TC 23/SC 23K more

Energy Efficiency - Customer Energy Management Systems - Part 3: Energy Manager (Proposed horizontal publication)

20.99   WD approved for registration as CD

TC 23/SC 23K more

High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"

30.99   CD approved for registration as DIS

TC 42 more

Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 3 more

Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)

30.99   CD approved for registration as DIS

TC 23/SC 23H more

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements

40.00   DIS registered

TC 82 more

Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment

20.99   WD approved for registration as CD

TC 82 more

Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 4: Interface protection and fault ride through

20.99   WD approved for registration as CD

TC 82 more

Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances

40.00   DIS registered

TC 82 more

Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 6: Power control functions and grid support

30.99   CD approved for registration as DIS

TC 82 more

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 7: Remote configuration, control and monitoring

30.99   CD approved for registration as DIS

TC 82 more

Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing

30.20   CD study/ballot initiated

TC 87 more