Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Railway applications - System energy efficiency
50.00 Final text received or FDIS registered for formal approval
IEC TR 63500-1: Unified power flow controller (UPFC) installations - Part 1: Performance
20.99 WD approved for registration as CD
Calibration of the prompt fission neutron logging tools
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
200 MeV to 400 MeV superconducting proton cyclotron - General requirements and test methods
40.20 DIS ballot initiated: 12 weeks
<p>CDD Database - Circuit-breakers and similar equipment for household use</p>
60.00 Standard under publication
Test method for continuous-switching evaluation of gallium nitride power conversion devices
40.99 Full report circulated: DIS approved for registration as FDIS
Solar Trackers - Requirements for the protection of personnel
20.99 WD approved for registration as CD
Maritime navigation and radiocommunication equipment and systems - VHF data Exchange system - Requirements and test methods for shipborne mobile Station
20.99 WD approved for registration as CD
Fixed folding durability test method for flexible opto-electric circuit boards
40.99 Full report circulated: DIS approved for registration as FDIS
Wearable electronic textiles - Test methods for performance of heating products - Heating temperature and power consumption
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Wearable electronic textiles - Test methods for performance of heating products - Heating temperature and power consumption
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Surge Arc Suppressor - Part 1: Surge Arc Suppressor (SAS) devices to Protect Power Line Insulation of systems > 1kV a.c.
30.60 Close of voting/ comment period
Machine learning-enabled medical device – Performance evaluation process
30.60 Close of voting/ comment period
Electrical relays - Tests and measurements - Part 0: General and guidance
50.00 Final text received or FDIS registered for formal approval
Electrical relays - Tests and measurements - Part 19: Electrical endurance
50.60 Close of voting. Proof returned by secretariat
Electrical relays - Tests and Measurement - Part 26: Crosstalk and insertion loss
30.60 Close of voting/ comment period
Electrical relays - Tests and measurements - Part 41: Tests and measurement procedures - Insulation coordination
60.00 Standard under publication