Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Radiation protection instrumentation - Installed radiation portal monitors (RPMs) for the detection of illicit trafficking of radioactive and nuclear materials
30.60 Close of voting/ comment period
Reed switches - Part 1-1: Generic specification - Blank detail specification
30.20 CD study/ballot initiated
Reed switches – Part 4: Application in conjunction with magnetic actuator used for magnetic sensing devices
30.20 CD study/ballot initiated
Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
30.99 CD approved for registration as DIS
Renewable energy off-grid systems - Part 120: Procurement processes, including tendering and evaluation
30.20 CD study/ballot initiated
Renewable energy off-grid systems - Part 202: Design for photovoltaic-wind power-diesel generation-energy storage (PV-WP-DG-ES) hybrid off-grid systems
20.99 WD approved for registration as CD
Recommendations for renewable energy and hybrid systems for rural electrification - Part 300: Generators
30.20 CD study/ballot initiated
Renewable energy off-grid systems - Part 310: Silicon solar module visual inspection guide
40.99 Full report circulated: DIS approved for registration as FDIS
Renewable energy off-grid systems - Part 320: Generator set - Off-grid wind turbines
20.99 WD approved for registration as CD
Renewable energy off-grid systems - Part 330: Generator set - Selection of generator sets for rural electrification systems
40.99 Full report circulated: DIS approved for registration as FDIS
Renewable energy off-grid systems - Part 345: Battery charge controllers for photovoltaic systems - Performance and functioning
30.99 CD approved for registration as DIS
Renewable energy off-grid systems - Part 420: Photovoltaic pumping systems - Design qualification and performance measurements
30.20 CD study/ballot initiated
Renewable energy off-grid systems - Part 421: Performance, safety, and durability assessment for small-scale off-grid solar water pumps
30.20 CD study/ballot initiated
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Nickel-cadmium prismatic rechargeable cells with partial gas recombination and batteries for use in industrial applications
50.60 Close of voting. Proof returned by secretariat
Enterprise-control system integration - Part 4: Object models and relationships for interfaces between manufacturing operations management functions
50.00 Final text received or FDIS registered for formal approval
Enterprise-control system integration — Part 4: Objects and attributes for manufacturing operations management integration
30.99 CD approved for registration as DIS
Enterprise-control system integration — Part 5: Business to manufacturing transactions
30.00 Committee draft (CD) registered