Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs Certification body: sertifikaciono.telo@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

Projects

Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard

Optical amplifiers – Test methods – Part 10-6: Four wave mixing crosstalk

10.20   New project ballot initiated

TC 86/SC 86C more

IEC 63412-3: Ultrasonics - Shear-wave elastography - Part 3: Procedures for performance and constancy testing

00.00   Proposal for new project received

TC 87 more

Wind Energy Generation Systems - Part 33: Bird mortality prevention strategies. Bird Detection and Identification Systems

00.00   Proposal for new project received

TC 88 more

FIRE HAZARD TESTING - Part 12-1: Electric arc-based test methods - AC Electric arc ignition energy test method for materials (AC EAIEM)

10.20   New project ballot initiated

TC 89 more

Guidelines for Coordinated Reactive Power and Voltage Control of Coupled Systems of Renewable Energy Generation and HVDC Transmission

10.20   New project ballot initiated

TC 8/SC 8A more

Microgrid - Part 3-7: Technical requirements - Data center microgrid monitoring, control, and energy management system

10.60   Close of voting

TC 8/SC 8B more

Decentralized multi-energy systems - Integration of Power-to-X (P2X) systems into decentralized energy systems - Part 2-1: General principles, framework, and use cases

10.60   Close of voting

TC 8/SC 8B more

Virtual Power Plant - Part 4: Primary Frequency Regulation Functional Requirements and Specification

10.60   Close of voting

TC 8/SC 8B more

Decentralized multiple energy systems Part 3-1-Technical Requirements: Energy Management System

10.20   New project ballot initiated

TC 8/SC 8B more

Standardization of Heat-Loss Measurement of ancillary systems to maintain the superconducting state, such as thermal insulation pipe and/or cryostat for superconducting cables and current leads

00.00   Proposal for new project received

TC 90 more

Circuit board assemblies - Part 8: Voiding in solder joints - Best practices

10.20   New project ballot initiated

TC 91 more

Thermal Endurance Test Method for Flexible Optic-Electric Circuit

00.99   Approval to ballot proposal for new project

TC 91 more

PRINTED BOARDS AND PRINTED BOARD ASSEMBLIES– DESIGN AND USE - Part 8: 3D shape data for CAD component library

00.99   Approval to ballot proposal for new project

TC 91 more

Noncontact Temperature measurement for LAB using IR camera

00.00   Proposal for new project received

TC 91 more

Electrical relay as interface for use in power applications (industrial and residential use)

10.60   Close of voting

TC 94 more

Requirements and roadmap for DC protection function standardisation

00.00   Proposal for new project received

TC 95 more

Insulation co-ordination for HVDC system — Part 1: Definitions, principles and rules

00.99   Approval to ballot proposal for new project

TC 99 more

Insulation co-ordination for HVDC system — Part 2: Application guidelines for line commutated converter (LCC) stations

00.99   Approval to ballot proposal for new project

TC 99 more