Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

IEC 62561-8 ED1

Lightning protection system components (LPSC) - Part 8: Requirements for components for electrically insulated LPS

General information

50.20     Mar 6, 2026

PRVD    Apr 17, 2026

IEC

TC 81

International Standard

29.020     91.120.40  

Scope

IEC 62561-8:2026 specifies the requirements and tests for components used for electrically insulated LPS. These components, which can reduce the separation distance, are as follows:
- insulating stand-offs, used in conjunction with an air-termination system and down-conductors with the aim of maintaining the proper separation distance;
- insulating down‑conductors, including their specific fasteners.
Testing of insulating stand-offs and insulating down-conductor components for an explosive atmosphere is not covered by this document.
This first edition cancels and replaces IEC TS 62561-8 published in 2018. This edition constitutes a technical revision.
This edition includes the following significant technical changes with respect to IEC TC 62561-8:2018:
a) title and scope of the standard has been adjusted;
b) the document has been updated in line with IEC 60068-2-52:2017 on salt mist treatment;
c) the document has been updated in line with ISO 22479:2019 on humid sulphureous atmosphere treatment;
d) two different possible example configurations for pull out tests have been introduced;
e) additional information on pollution has been included;
f) an alternate test arrangement for high voltage impulse test has been included;
g) a new normative Annex H for applicability of previous tests has been introduced;
h) pass criteria for high voltage impulse testing updated;
i) explanation on high voltage impulse testing with negative polarity has been added.

Life cycle

PREVIOUSLY

PUBLISHED
IEC TS 62561-8:2018 ED1

NOW

PROJECT
IEC 62561-8 ED1
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Mar 6, 2026

National adoptions

Lightning protection system components (LPSC) - Part 8: Requirements for components for electrically insulated LPS

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

N081 more

Preview

To view the full content, you need to register or to log in to your account by clicking on the "Log in" button

Login