Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs Certification body: sertifikaciono.telo@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

IEC 63555 ED1

LED Light sources – Performance requirements

General information

50.20     Oct 23, 2026

PRVD    Dec 4, 2026

IEC

TC 34/SC 34A

International Standard

29.140.01     29.140.99  

Scope

IEC 63555:2026 specifies performance requirements for LED light sources connected to a DC supply of up to 1 500 V or an AC supply of up to 1 000 V. This document specifies requirements and test methods for electrical, photometric, colorimetric and dimensional characteristics.
This document covers LED light sources that produce light with a correlated colour temperature typically between 2 200 and 6 500 K, based on inorganic LED technology.
This first edition cancels and replaces IEC 62612:2013, IEC 62612:2013/AMD1:2015, IEC 62612:2013/AMD2:2018, IEC 62717:2014, IEC 62717:2014/AMD1:2015 and IEC 62717:2014/AMD2:2019. This edition constitutes a technical revision.
This edition includes the following significant technical changes with respect to IEC 62612:2013, IEC 62612:2013/AMD1:2015, IEC 62612:2013/AMD2:2018, IEC 62717:2014, IEC 62717:2014/AMD1:2015 and IEC 62717:2014/AMD2:2019:
a) IEC 62612 and IEC 62717 have been merged into an LED light source standard;
b) the luminous flux maintenance requirements have been fully reviewed and moved to an informative annex (Annex K – Luminous flux maintenance at 3 000 h) and the test time reduced to 3 600 h;
c) the lumen maintenance code has been deleted;
d) sample sizes have been fully reviewed and a new informative Annex M – Verification testing has been introduced;
e) Symbols u',v' and Duv have been introduced;
f) relevancy of the endurance test reviewed and considered no longer relevant for the market as part of this document.

Life cycle

NOW

PROJECT
IEC 63555 ED1
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Oct 23, 2026

National adoptions

LED light sources - Performance requirements

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

N034 more

Preview

To view the full content, you need to register or to log in to your account by clicking on the "Log in" button

Login