Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

SRPS EN 62439-2:2010

Industrial communication networks - High availability automation networks - Part 2: Media Redundancy Protocol (MRP)

Dec 30, 2010
95.99   Withdrawal of Standard   Jun 24, 2019

General information

95.99     Jun 24, 2019

ISS

N065

European Norm

25.040     35.040  

English  

Buying

Withdrawn

Language in which you want to receive the document.

Scope

IEC 62439-2:2010(E) is applicable to high-availability automation networks based on the ISO/IEC 8802-3 (IEEE 802.3) (Ethernet) technology. It specifies a recovery protocol based on a ring topology, designed to react deterministically on a single failure of an inter-switch link or switch in the network, under the control of a dedicated media redundancy manager node. It cancels and replaces IEC 62439 published in 2008 and constitutes a technical revision. It includes the following significant technical changes with respect to IEC 62439 (2008): - adding a calculation method for RSTP (rapid spanning tree protocol, IEEE 802.1Q), - adding two new redundancy protocols: HSR (High-availability Seamless Redundancy) and DRP (Distributed Redundancy Protocol), - moving former Clauses 1 to 4 (introduction, definitions, general aspects) and the Annexes (taxonomy, availability calculation) to IEC 62439-1, which serves now as a base for the other documents, - moving Clause 5 (MRP) to IEC 62439-2 with minor editorial changes, - moving Clause 6 (PRP) was to IEC 62439-3 with minor editorial changes, - moving Clause 7 (CRP) was to IEC 62439-4 with minor editorial changes, and - moving Clause 8 (BRP) was to IEC 62439-5 with minor editorial changes, - adding a method to calculate the maximum recovery time of RSTP in a restricted configuration (ring) to IEC 62439-1 as Clause 8, - adding specifications of the HSR (High-availability Seamless Redundancy) protocol, which shares the principles of PRP to IEC 62439-3 as Clause 5, and - introducing the DRP protocol as IEC 62439-6.

Life cycle

NOW

WITHDRAWN
SRPS EN 62439-2:2010
95.99 Withdrawal of Standard
Jun 24, 2019

REVISED BY

WITHDRAWN
SRPS EN 62439-2:2017

Related project

Adopted from EN 62439-2:2010