Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

SRPS EN 62382:2010

Electrical and instrumentation loop check

Dec 30, 2010
95.99   Withdrawal of Standard   Dec 23, 2016

General information

95.99     Dec 23, 2016

ISS

N065

European Norm

25.040.01  

English  

Buying

Withdrawn

Language in which you want to receive the document.

Scope

describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. Is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).

Life cycle

NOW

WITHDRAWN
SRPS EN 62382:2010
95.99 Withdrawal of Standard
Dec 23, 2016

Related project

Adopted from EN 62382:2007