Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

SRPS EN 1538:2011

Execution of special geotechnical work - Diaphragm walls

Nov 28, 2011
95.99   Withdrawal of Standard   Jan 31, 2018

General information

95.99     Jan 31, 2018

ISS

U182

European Norm

93.020  

English  

Buying

Withdrawn

Language in which you want to receive the document.

Scope

This European Standard establishes general principles for the execution of diaphragm walls as either retaining walls or cut-off walls.
NOTE 1 This standard covers only structures constructed in a trench excavated with a support fluid or in dry conditions, where soil is removed and replaced by concrete or slurry and with wall thickness B ≥ 40 cm.
NOTE 2 Diaphragm walls can be permanent or temporary structures.
NOTE 3 The following types of structure are considered:
a) retaining walls: usually constructed to support the sides of an excavation in the ground. They include:
1) cast in situ concrete diaphragm walls;
2) precast concrete diaphragm walls;
3) reinforced slurry walls;
b) cut-off walls: usually constructed to prevent migration of groundwater, clear or polluted, or of other contaminants present in the ground. They include:
1) slurry walls (possibly with membranes or sheet piles);
2) plastic concrete walls.
NOTE 4 Walls formed shallow vertical trenches (typically excavations with a ratio of depth over thickness D/B < 5 or D < 5 m) are not covered by this standard.

Life cycle

NOW

WITHDRAWN
SRPS EN 1538:2011
95.99 Withdrawal of Standard
Jan 31, 2018

REVISED BY

PUBLISHED
SRPS EN 1538:2015

Related project

Adopted from EN 1538:2010