Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

SRPS EN 12699:2012

Execution of special geotechnical work - Displacement piles

Apr 27, 2012
95.99   Withdrawal of Standard   Nov 30, 2015

General information

95.99     Nov 30, 2015

ISS

U182

European Norm

93.020  

English  

Buying

Withdrawn

Language in which you want to receive the document.

Scope

1.1 This standard establishes general principles for the execution of displacement piles which are installes in the ground without excavation or removal of material from the ground except for limiting heave, vibration, removal of obstructions or to assist penetration. Piles are driven into the ground using impact, vibration, pressing, screwing or a combination of these methods. The material of displacement piles covered by this standard can be: -steel, -cast iron, -concrete, -timber, -grout, -combination of above.

Life cycle

NOW

WITHDRAWN
SRPS EN 12699:2012
95.99 Withdrawal of Standard
Nov 30, 2015

REVISED BY

PUBLISHED
SRPS EN 12699:2015

Related project

Adopted from EN 12699:2000