Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

SRPS EN 61158-4-2:2013

Industrial communication networks - Fieldbus specifications - Part 4-2: Data-link layer protocol specification - Type 2 elements

Jun 24, 2013
95.99   Withdrawal of Standard   Dec 25, 2017

General information

95.99     Dec 25, 2017

ISS

N065

European Norm

25.040.40     35.100.20     35.110  

English  

Buying

Withdrawn

Language in which you want to receive the document.

Scope

IEC 61158-4-2:2010(E) describes the protocol that provides communication opportunities to all participating data-link entities, sequentially and in a cyclic synchronous manner. Foreground scheduled access is available for time-critical activities together with background unscheduled access for less critical activities. Deterministic and synchronized transfers can be provided at cyclic intervals up to 1 ms and device separations of 25 km. This performance is adjustable dynamically and on-line by re-configuring the parameters of the local link whilst normal operation continues. By similar means, DL connections and new devices may be added or removed during normal operation. This protocol provides means to maintain clock synchronization across an extended link with a precision better than 10 s. This second edition cancels and replaces the first edition published in 2007 and constitutes a technical revision. The main changes with respect to the previous edition are: -Clause 2 and Bibliography: update of normative and bibliographic references; - subclause 3.5: update of abbreviations; - subclause 7.6: updates of the Ethernet Link object; - subclause 7.7: minor update of the Devicenet object (additional attribute); - new subclauses 7.9 and 7.10: new DLR and QoS objects; - new Clause 10: new DLR protocol.

Life cycle

PREVIOUSLY

WITHDRAWN
SRPS EN 61158-4-2:2010

NOW

WITHDRAWN
SRPS EN 61158-4-2:2013
95.99 Withdrawal of Standard
Dec 25, 2017

REVISED BY

WITHDRAWN
SRPS EN 61158-4-2:2015

Related project

Adopted from EN 61158-4-2:2012