Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

SRPS EN 54-7:2019

Fire detection and fire alarm systems - Part 7: Smoke detectors - Point smoke detectors that operate using scattered light, transmitted light or ionization

Jan 31, 2019

General information

90.93     Apr 18, 2024

90.00    Apr 18, 2029

ISS

Z021

European Norm

13.220.20  

English  

Buying

Published

Language in which you want to receive the document.

Scope

This draft European Standard specifies requirements, test methods and performance criteria for point smoke detectors that operate using scattered light, transmitted light or ionization, intended for use in fire detection and fire alarm systems installed in and around buildings (see EN 54 1:2011).
This European standard provides for the assessment of verification of consistency of performance (AVCP) of point smoke detectors to this EN.
For other types of smoke detector, or smoke detectors working on different principles, this standard should only be used for guidance. Smoke detectors with special characteristics and developed for specific risks are not covered by this standard.
NOTE Certain types of detector contain radioactive materials. The national requirements for radiation protection differ from country to country and they are not specified in this standard.

Related directives

NOTE: If the word "harmonized" (marked in green) is not found in the field with the name of the directive, it means that the European standard is not cited in the OJEU.

305/2011

Regulation (eu) No 305/2011 of the European Parliament and of the Council of 9 march 2011 laying down harmonised conditions for the marketing of construction products and repealing council directive 89/106/eec

Harmonized

Life cycle

PREVIOUSLY

WITHDRAWN
SRPS EN 54-7:2008/A2:2008

WITHDRAWN
SRPS EN 54-7:2008

NOW

PUBLISHED
SRPS EN 54-7:2019
90.93 Standard confirmed
Apr 18, 2024

Related project

Adopted from EN 54-7:2018