SRPS EN 16603-20-20:2018

Space engineering - Electrical design and interface requirements for power supply

Oct 31, 2018

General information

90.60     Mar 3, 2024

ISS

S020

European Norm

49.140  

English  

Van plana 2016

Buying

Published

Language in which you want to receive the document.

Scope

The target applications covered by this standard are all missions traditionally provided with power distribution and protection by LCLs/RLCLs (science, earth observation, navigation) with exclusion of telecom applications which are traditionally provided with power distribution and protection by fuses.
The present standard applies to power distribution by LCLs/RLCLs for power systems, and in general for satellites, required to be Single Point Failure Free.
The present standard document applies exclusively to the main bus power distribution by LCLs/RLCLs to external satellite loads.
Internal power system protections of LCLs/RLCLs are not covered.
Paralleling of LCLs to increase power supply line reliability is not covered by the present standard, since this choice does not appreciably change the reliability of the overall function (i.e. LCL plus load).
In fact, a typical reliability figure of the LCL (limited to the loss of its switch ON capability) is 20 FIT or less.
If the load to be connected to the LCL line has a substantial higher failure rate than this, it is not necessary to duplicate the LCL to supply that load.

Life cycle

NOW

PUBLISHED
SRPS EN 16603-20-20:2018
90.60 Close of review
Mar 3, 2024

Related project

Adopted from EN 16603-20-20:2018