Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Energy efficiency - Customer energy management systems - Part 3: Energy manager (Proposed horizontal publication)
10.99 New project approved
Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment
10.99 New project approved
Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing
10.99 New project approved
Robotics for electricity generation, transmission and distribution systems - Part 2-1: General technical requirements for uas for overhead power lines inspection
10.99 New project approved
Robotics for electricity generation, transmission and distribution systems - Wheeled, tracked or legged robots — part 3‑21: Overhead transmission line inspection robot - General requirements
10.99 New project approved
Robotics for electricity generation, transmission and distribution systems - Wheeled, tracked or legged robots - Part 3‑31: Land cable tunnel inspection robot - General requirements.
10.99 New project approved
Protective devices based on semiconductor technology for household and similar use - Part 1: Semiconductor residual current operated circuit-breakers with integral overcurrent protection for household and similar uses (SC-RCBOs)
10.99 New project approved
Leaky waveguide - Part 3: Sectional specification for rigid rectangular leaky waveguides
10.99 New project approved
Assessment of human exposure to electromagnetic fields from radiative wireless power transfer systems: Measurement and computational methods (Frequency Range of 30 MHz to 300 GHz)
10.99 New project approved
Intelligent information request and delivery - A process model for the exchange of information for use
10.99 New project approved
Semiconductor devices - Isolation for semiconductor devices - Part 1: Failure mechanisms and measurement methods to evaluate solid insulation for semiconductor devices
10.99 New project approved
Lighting systems - Electro-mechanical interfaces - Part 2-2: Two-contact and luminaire interface type zb20
10.99 New project approved
Lighting systems - Electro-mechanical interfaces - Part 2-3: Ans seven-contact twist-lock interface including type zb18n
10.99 New project approved
Technical guideline for the application, specification, and testing of phase-shifting transformers
10.99 New project approved
Solar trackers - Requirements for the protection of personnel
10.99 New project approved
Maritime navigation and radiocommunication equipment and systems - VHF data exchange system - Requirements and test methods for shipborne mobile station
10.99 New project approved
Surge arc suppressor - Part 1: Surge arc suppressor (SAS) devices to protect power line insulation of systems > 1kv a.c.
10.99 New project approved
Machine learning-enabled medical device - Performance evaluation process
10.99 New project approved