Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Railway applications - Fixed installations - High-voltage/low-voltage prefabricated substations in AC and DC electric traction systems
50.60 Close of voting. Proof returned by secretariat
Railway Applications - Requirements for software development
40.60 Close of voting
Fixed Ultrasonic Gas Leak Detectors (UGLD) - General requirements and test methods
10.99 New project approved
Emergency and danger systems - Part 3: Emergency and danger response systems (EDRS) - Risk management file and examples for applications
40.60 Close of voting
Railway applications - Fixed installations and rolling stock - Interface requirements between charging infrastructure with dedicated contact line sections and electric traction units with onboard electric traction energy storages and current collectors
50.60 Close of voting. Proof returned by secretariat
Method to achieve circular designs of products
50.60 Close of voting. Proof returned by secretariat
Railway Applications - Fixed installations and rolling stock - Interface requirements between charging infrastructure with dedicated contact line sections and electric traction units with onboard electric traction energy storage systems and current collectors
10.99 New project approved
Electric mobility – Measuring systems for supply equipment
20.60 Close of comment period
Railway application - Communication, signalling and processing system - Test requirements for signalling and telecommunication equipment
50.60 Close of voting. Proof returned by secretariat
Cable management systems - Design-for-recycling guidelines for PVC cable management products
50.60 Close of voting. Proof returned by secretariat
Safety of machinery - Protection against corruption
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Ecodesign for power electronics including product specific rules for life cycle and material efficiency assessment
45.99 Dispatch of FV draft to CCMC
Alarm Systems - Hazard Warning Systems - Part 1: Hazard warning systems for use in residential buildings - System requirements
45.99 Dispatch of FV draft to CCMC
Secondary portable batteries - Lithium-ion
30.99 CD approved for registration as DIS
Secondary batteries for light means of transport - Part 1: Test specifications for performance and durability aspects for lithium-ion and sodium-ion batteries
40.20 DIS ballot initiated: 12 weeks
Assessment of electrical flexibility services from power network perspective
40.10 harmonizedStageCodeLabel.40.10
Cybersecurity requirements for platforms of smartcards and similar devices including secure elements
40.60 Close of voting
Cybersecurity requirements for microprocessors and microcontrollers with security-related functionalities
40.60 Close of voting