Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs Certification body: sertifikaciono.telo@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

Projects

Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard

Corrigendum 1 - Converter transformers - Part 1: Transformers for industrial applications

10.99   New project approved

N014 more

Converter transformers - Part 3: Application guide

10.99   New project approved

N014 more

Conduit systems for cable management - Part 22: Particular requirements - Pliable conduit systems

10.99   New project approved

N023 more

Overhead lines - Requirements for greases for aluminium, aluminium alloy and steel bare conductors

10.99   New project approved

N011 more

Corrigendum 1 - Overhead lines - Requirements for greases for aluminium, aluminium alloy and steel bare conductors

10.99   New project approved

N011 more

Safety of machinery - Ergonomic design principles - Part 1: General principles and their embedding in the design process

20.60   Close of comment period

M199 more

Design requirements for Wind Turbine Generators

20.99   WD approved for registration as CD

N002 more

Amendment 1 - Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines

40.60   Close of voting

N088 more

Wind energy generation systems - Part 12-5: Power performance - Assessment of obstacles and terrain

10.99   New project approved

N088 more

Wind energy generation systems - Part 16: Standard format for sharing power curves and associated information

40.60   Close of voting

N088 more

Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models

40.20   DIS ballot initiated: 12 weeks

N088 more

Wind energy generation systems - Part 40: Electromagnetic compatibility (EMC) - Requirements and test methods

50.99   FDIS or proof approved for publication

N088 more

Wind energy generation systems - Part 6: Tower and foundation design requirements

10.99   New project approved

N088 more

Identification link - Part 1: General requirements

40.60   Close of voting

N065 more

Gas analysis - Preparation of calibration gas mixtures - Part 1: Gravimetric method for Class I mixtures - Amendment 1: Corrections to formulae in Annex E and Annex G (ISO 6142-1:2015/Amd 1:2020)

40.60   Close of voting

H193 more

Low-voltage switchgear and controlgear assemblies - Part 1: General rules

45.99   Dispatch of FV draft to CCMC

N023 more

Low-voltage switchgear and controlgear assemblies - Part 2: Power switchgear and controlgear assemblies

45.99   Dispatch of FV draft to CCMC

N023 more

Low-voltage switchgear and controlgear assemblies - Part 4: Particular requirements for assemblies for construction sites (ACS)

50.60   Close of voting. Proof returned by secretariat

N023 more