Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Standard interface for connecting charging stations to local energy management systems - Part 1: General requirements, use cases and abstract messages
50.60 Close of voting. Proof returned by secretariat
Standard interface for connecting charging stations to local energy management systems - Part 2: Specific data model mapping
50.60 Close of voting. Proof returned by secretariat
Standard interface for connecting charging stations to local energy management systems - Part 3 Communication protocol and cybersecurity specific aspects
50.60 Close of voting. Proof returned by secretariat
Management of distributed energy storage systems based on electrically chargeable vehicle batteries - Part 1: Use cases and architectures
50.60 Close of voting. Proof returned by secretariat
Hybrid CPV/PV modules: General characteristics and measurement procedures - Part 1: Performance measurements and power rating - Irradiance and temperature
50.60 Close of voting. Proof returned by secretariat
Report on the development of cogeneration
10.99 New project approved
Sustainable management of waste electrical and electronic equipment (e-waste)
50.60 Close of voting. Proof returned by secretariat
Photovoltaic (PV) modules - Qualifying guidelines for increased hail resistance
10.99 New project approved
Corrigendum 1 - Photovoltaic (PV) modules - Qualifying guidelines for increased hail resistance
10.99 New project approved
Black start of hydropower plant
50.00 Final text received or FDIS registered for formal approval
Energy efficiency - Customer energy management systems - Part 1: General requirements and architecture
50.60 Close of voting. Proof returned by secretariat
Energy efficiency - Customer energy management systems - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource managers
50.60 Close of voting. Proof returned by secretariat
High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"
40.60 Close of voting
Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)
50.60 Close of voting. Proof returned by secretariat
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances
40.60 Close of voting
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 7: Remote configuration, control and monitoring
40.60 Close of voting