Phone: (011) 7541-421, 3409-301, 3409-335, 6547-293, 3409-310
E-mail: Standards sales: prodaja@iss.rs Education: iss-edukacija@iss.rs Information about standards: infocentar@iss.rs
Stevana Brakusa 2, 11030 Beograd
Main menu

Projects

Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard

Standard interface for connecting charging stations to local energy management systems - Part 1: General requirements, use cases and abstract messages

50.60   Close of voting. Proof returned by secretariat

N021 more

Standard interface for connecting charging stations to local energy management systems - Part 2: Specific data model mapping

50.60   Close of voting. Proof returned by secretariat

N021 more

Standard interface for connecting charging stations to local energy management systems - Part 3 Communication protocol and cybersecurity specific aspects

50.60   Close of voting. Proof returned by secretariat

N021 more

Management of distributed energy storage systems based on electrically chargeable vehicle batteries - Part 1: Use cases and architectures

50.60   Close of voting. Proof returned by secretariat

N021 more

Hybrid CPV/PV modules: General characteristics and measurement procedures - Part 1: Performance measurements and power rating - Irradiance and temperature

50.60   Close of voting. Proof returned by secretariat

N082 more

Report on the development of cogeneration

10.99   New project approved

N005 more

Fire test for concentrator PV modules

10.99   New project approved

N082 more

Sustainable management of waste electrical and electronic equipment (e-waste)

50.60   Close of voting. Proof returned by secretariat

N040 more

Photovoltaic (PV) modules - Qualifying guidelines for increased hail resistance

10.99   New project approved

N082 more

Corrigendum 1 - Photovoltaic (PV) modules - Qualifying guidelines for increased hail resistance

10.99   New project approved

N082 more

Black start of hydropower plant

50.00   Final text received or FDIS registered for formal approval

N004 more

Energy efficiency - Customer energy management systems - Part 1: General requirements and architecture

50.60   Close of voting. Proof returned by secretariat

N023 more

Energy efficiency - Customer energy management systems - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource managers

50.60   Close of voting. Proof returned by secretariat

N210 more

High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"

40.60   Close of voting

N017AC more

Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)

50.60   Close of voting. Proof returned by secretariat

N023 more

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements

50.20   Proof sent to secretariat or FDIS ballot initiated: 8 weeks

N082 more

Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances

40.60   Close of voting

N082 more

Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment - Part 7: Remote configuration, control and monitoring

40.60   Close of voting

N082 more