Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Methods for the calibration of vibration and shock transducers — Part 41: Calibration of laser vibrometers
00.00 Proposal for new project received
Methods for the calibration of vibration and shock transducers — Part 46: Part 46: Low-frequency calibration by machine vision systems
00.60 Close of review
Guidelines for treated wastewater use for irrigation projects — Part 8: Reservoirs
30.60 Close of voting/ comment period
Condition monitoring and diagnostics of wind turbines — Part 1: General guidelines
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Condition monitoring and diagnostics of wind turbines — Part 3: Monitoring the structure
30.60 Close of voting/ comment period
Vapour vacuum pumps — Measurement of performance characteristics — Part 1: Measurement of volume rate of flow (pumping speed)
00.00 Proposal for new project received
Vapour vacuum pumps — Measurement of performance characteristics — Part 2: Measurement of critical backing pressure
00.00 Proposal for new project received
Implants for surgery — Roentgen stereophotogrammetric analysis for the assessment of migration of orthopaedic implants
00.00 Proposal for new project received
Water quality — Analysis of microplastics in water — Part 1: General
20.00 New project registered in TC/SC work programme
Water quality — Analysis of microplastic in water — Part 3: Thermo-analytical methods for waters with low content of suspended solids including drinking water
40.60 Close of voting
Water quality — Analysis of microplastics in water — Part 4: Sample preparation for analysis of microplastics in water
20.00 New project registered in TC/SC work programme
Ground vulcanized rubber, crumb, powdered rubber - Evaluation procedures
30.00 Committee draft (CD) registered
Packaging — Transport packaging for dangerous goods — Conditions of use for recycled plastics material
40.60 Close of voting
Hydrogen generators using fuel processing technologies — Part 2: Test methods for performance
30.20 CD study/ballot initiated
Nuclear criticality safety — Estimation of the number of fissions of a postulated criticality accident — Amendment 1
40.60 Close of voting
Agricultural and forestry machinery — Environmental requirements for sprayers — Part 1: General
30.60 Close of voting/ comment period
Agricultural and forestry machinery — Environmental requirements for sprayers — Part 2: Horizontal boom sprayers
30.60 Close of voting/ comment period
Agricultural and forestry machinery — Environmental requirements for sprayers — Part 3: Sprayers for bush and tree crops
30.60 Close of voting/ comment period