Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Industrial valves — Measurement, test and qualification procedures for fugitive emissions — Part 2: Production acceptance test of valves
10.99 New project approved
UV-C Devices — Safety information — Permissible human exposure
50.60 Close of voting. Proof returned by secretariat
Industrial trucks — Specifications for indicator lights for container handling and grappler arm operations
30.60 Close of voting/ comment period
Plastics piping systems for hot and cold water installations — Polypropylene (PP) — Part 1: General
30.20 CD study/ballot initiated
Plastics piping systems for hot and cold water installations — Polypropylene (PP) — Part 2: Pipes
30.20 CD study/ballot initiated
Plastics piping systems for hot and cold water installations — Polypropylene (PP) — Part 3: Fittings
30.20 CD study/ballot initiated
Plastics piping systems for hot and cold water installations — Polypropylene (PP) — Part 5: Fitness for purpose of the system
30.20 CD study/ballot initiated
Washer-disinfectors — Part 4: Requirements and tests for washer-disinfectors employing chemical disinfection for thermolabile endoscopes
30.20 CD study/ballot initiated
Information and documentation — Transliteration of Indic scripts into Latin characters
40.20 DIS ballot initiated: 12 weeks
Industrial automation systems and integration — Integration of life-cycle data for process plants including oil and gas production facilities — Part 100: Vocabulary
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Industrial automation systems and integration — Integration of life-cycle data for process plants including oil and gas production facilities — Part 2: Data model
10.99 New project approved
Industrial automation systems and integration — Integration of life-cycle data for process plants including oil and gas production facilities — Part 200: RDF(S) implementation of the data model
20.00 New project registered in TC/SC work programme
Industrial automation systems and integration — Integration of life-cycle data for process plants including oil and gas production facilities — Part 4: Core reference data
30.60 Close of voting/ comment period
Hygrothermal performance of buildings — Calculation and presentation of climatic data — Part 4: Hourly data for assessing the annual energy use for heating and cooling
20.00 New project registered in TC/SC work programme
Graphic technology — Prepress digital data exchange using PDF — Part 9: Complete exchange of printing data (PDF/X-6) and partial exchange of printing data with external profile reference (PDF/X-6p and PDF/X-6n) using PDF 2.0
30.60 Close of voting/ comment period
Soil, waste, treated biowaste and sludge — Determination of total organic carbon (TOC) by dry combustion
40.60 Close of voting
Indoor air — Part 10: Determination of the emission of volatile organic compounds from building products and furnishing — Emission test cell method
10.99 New project approved