Search Serbian, European and international standards. Identify the standard organization, select the standard number or keyword, and complete the search you want. You can also add a standard drafting stage or a committee / national committee that drafted the standard
Non-destructive testing — Eddy current testing — Vocabulary
00.00 Proposal for new project received
Zinc sulfide concentrates— Determination of zinc content— Ion-exchange/Na2EDTA titrimetric method
30.20 CD study/ballot initiated
Copper, lead and zinc ores and concentrates — Precision and bias of mass measurement techniques
00.00 Proposal for new project received
Nuclear energy — Vocabulary — Part 1: General terminology
30.00 Committee draft (CD) registered
Nuclear energy, nuclear technologies, and radiological protection — Vocabulary — Part 6: Nuclear medicine
20.00 New project registered in TC/SC work programme
Nuclear energy, nuclear technologies, and radiological protection — Vocabulary — Part 7: Aging management and life management for nuclear power plants
30.00 Committee draft (CD) registered
Double-pitch precision roller chains, attachments and associated chain sprockets for transmission and conveyors
30.60 Close of voting/ comment period
Fans — Efficiency classification for fans — Part 2: Standard losses for drive components
20.00 New project registered in TC/SC work programme
Fans — Efficiency classification for fans — Part 3: Fans without drives at maximum operating speed — Amendment 1
50.00 Final text received or FDIS registered for formal approval
Fans — Efficiency classification for fans — Part 4: Driven fans at maximum operating speed — Amendment 1
50.00 Final text received or FDIS registered for formal approval
Intelligent transport systems — Automated valet driving systems (AVDS) — Part 1: Requirements, system framework, communication interfaces and test procedures
50.00 Final text received or FDIS registered for formal approval
Intelligent transport systems — Automated Valet Driving Systems (AVDS) — Part 2: Part 2: System framework, security procedures and requirements
30.60 Close of voting/ comment period
Nanotechnologies — Phytotoxicity assessment of manufactured nanomaterials using soil grown Arabidopsis thaliana
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Intelligent transport systems — Public transport — Framework of Internet of Things (IoT) Application Programming Interface (API) layer for Interoperable Fare Management System (IFMS)
00.00 Proposal for new project received
Technical product documentation (TPD) — General principles of representation — Part 2: Basic conventions for lines
00.99 Approval to ballot proposal for new project
Technical product documentation (TPD) — General principles of representation — Part 3: Views, sections and cuts
00.00 Proposal for new project received
Nuclear fuel technology — Guidelines on the measurement of the specific surface area of uranium dioxide and plutonium dioxide powders by the BET method
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Safe transport of radioactive materials — Leakage testing on packages
20.00 New project registered in TC/SC work programme